My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/08/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/08/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:43:55 AM
Creation date
3/23/2016 9:03:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/08/2013
Meeting Body
Board of County Commissioners
Book and Page
302
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NO.tif
SmeadsoftID
14229
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Van Fleet Water Production Facility Improvements BVP 13-196 <br /> Proceed. The actual Start Date shall be within ten (10) days of Notice to Proceed date or when all <br /> applicable permits have been secured, unless otherwise stated. <br /> 2.25 The term "Professional" means the architectural/engineering firm or individual retained by the <br /> County or in-house designated person designated to perform the design and/or resident engineering <br /> services for the Work. The Professional can also serve as the Project Manager. <br /> 2.26 The term "Project Area" means the area within which are the specified Contract Limits of the <br /> improvements contemplated to be constructed in whole or in part under this Contract. <br /> 2.27 The term "Project Manager" means the Polk County representative in charge, employed by the <br /> County,for the purpose of directing or being in charge of the work embraced in this Contract. <br /> 2.28 The term "Procurement Director" means the Director of Polk County Procurement Division or <br /> their authorized representatives. <br /> 2.29 The "Risk Management Plan (RMP)" is defined as the technical information provided by the <br /> Best Value contractor during the Pre-Award Phase that details the Contractor's work plan, including all <br /> risks identified and the solutions to minimize those risks. The RM Plan is developed in concert with the <br /> user division. <br /> 2.30 The term"Start Date"means the date of commencement of the work. <br /> 2.31 The term "Technical Reports" means the reports issued by the County or the Project Manager <br /> consisting of written technical material such as soil reports. <br /> 2.32 The term "Weekly Risk Report" is the information documented by the Best Value Contractor <br /> during the construction phase of the Project. It shall contain all risks encountered, the efforts made to <br /> minimize those risks, and the outcome. This report shall be delivered to the County and to PBSRG on a <br /> weekly basis. <br /> 2.33 The term "Work" means the entire completed construction or the various separately identifiable <br /> parts thereof required to be furnished under the Contract Documents. Work includes and is the result of <br /> performing or furnishing labor; furnishing and incorporating material and equipment in the construction; <br /> performing or furnishing services; and furnishing documents, all as required by the Contract Documents. <br /> 2.34 The term"Substantial Completion"means project/work is ready for its intended use. See Article <br /> 16.5.2 of the General Conditions. <br /> 2.35 The term"Final Completion"means all work and materials are completed and installed in <br /> accordance with the approved design documentation. See Article 16.8.1 of General Conditions. <br /> ARTICLE 3—PRELIMINARY MATTERS <br /> 3.1 Delivery of Bonds <br /> 3.1.1 When the Contractor delivers the executed Contract to the County, the Contractor shall also <br /> deliver to the County such Bonds and insurance as may be required in accordance with these Contract <br /> Documents. <br /> 59 <br /> ►�2• s9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.