My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/08/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/08/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:43:55 AM
Creation date
3/23/2016 9:03:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/08/2013
Meeting Body
Board of County Commissioners
Book and Page
302
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NO.tif
SmeadsoftID
14229
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Van Fleet Water Production Facility Improvements BVP 13-196 <br /> 7.9 Use of Premises <br /> 7.9.1 The Contractor shall confine their equipment, storage of material, storage of equipment and the <br /> operations of their workers to the areas permitted by law, ordinances, permits or the requirements of the <br /> Contract Documents. The Contractor shall not unreasonably encumber the site with material and <br /> equipment. Any loss or damage to the Contractor's or any subcontractor's equipment is solely at the risk <br /> of the Contractor. <br /> 7.9.2 During the progress of the Work, the Contractor shall keep the premises free from accumulations <br /> of waste material, rubbish and other debris or contaminates resulting from the Work. At the completion <br /> of the Work, the Contractor shall remove all waste material, rubbish and debris from and about the <br /> premises as well as all tools, appliances, construction equipment, machinery and surplus material. The <br /> Contractor shall leave the site clean and ready for occupancy by the County at substantial completion of <br /> the Work. The Contractor shall restore to original condition all property so designated for alteration by <br /> the Contract Documents. <br /> 7.9.3 The Contractor shall not load or permit any part of any structure to be loaded in any manner that <br /> will endanger the structure. The Contractor shall not subject any part of the Work or adjacent property to <br /> stresses or pressures that will endanger them. <br /> 7.10 Record Documents <br /> 7.10.1 The Contractor shall keep at the site and in good order one record copy of the Contract <br /> Documents to include all Drawings and Specifications. These documents shall be annotated on a <br /> continuing basis to show all changes made during the construction process. These shall be available to <br /> the Professional and the Project Manager for their review. Upon completion of the requirements of the <br /> Contract Documents the Contractor shall turn over these annotated documents to the County unless <br /> instructed otherwise in the Supplementary Conditions. <br /> 7.11 Safety and Protection <br /> 7.11.1 The Contractor shall take all necessary precautions for the safety of and will provide the <br /> necessary protection to prevent damage, injury or loss to: <br /> 7.11.1.2 All employees on the Work and other persons who may be affected by it. <br /> 7.11.1.3 All the Work and all material or equipment to be incorporated, whether in storage on <br /> or off the site. The Contractor shall assume all risk of loss for stored equipment or material, irrespective <br /> of whether the Contractor has transferred the title of the stored equipment or material to the County. <br /> 7.11.1.4 Other property at the site or adjacent to it, including trees, shrubs, lawns, walks, <br /> pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the <br /> course of construction. <br /> 7.11.2 The Contractor is responsible for observing all OSHA regulations and shall self-inspect to ensure <br /> this is accomplished. The Contractor shall ensure that all personnel are properly trained and shall be able <br /> to provide documentation for their personnel that have attended training courses. Examples of such <br /> training courses are: Hazard Communications, Traffic Work Zone Safety, Personal Protective <br /> Equipment, First Aid/CPR, Permit Required Confined Space, Lock Out/Tag Out of Hazardous Energy. <br /> 71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.