Laserfiche WebLink
Van Fleet Water Production Facility Improvements BVP 13-196 <br /> the authorized representative, the division Project Manager and County Risk Management. Non- <br /> adherence to this policy could be cause for disqualification of the Contractor on future County Projects. <br /> 7.11.8 Should the County Safety Manager, require the OSHA 300 Log, a written safety and health plan <br /> and/or training documents, these documents shall be at this office within 24 hours of the request. <br /> Failure to provide the documentation within that time frame may cause the job to be shut down, <br /> at no expense to the County, until such documents are received. <br /> 7.11.9 In any event the County may stop the work when, in the County's opinion, the work is being <br /> performed in violation of any health and safety rules, regulations or laws. This includes environmental <br /> issues. <br /> 7.11.10 When it becomes necessary to stop the work for any of the reasons contained herein, the County <br /> shall issue a Stop Work Order to instruct the Contractor to cease work on the Project. The County shall <br /> not be penalized in any manner as a result of this Stop Work Order. <br /> 7.12 Drug Free Work Place Policy <br /> 7.12.1 The County has a very comprehensive policy to ensure a drug free work place. The substance of <br /> this policy shall become a part of this contract as described below. <br /> 7.12.1.2.1 The Contractor and its employees and subcontractors are strictly prohibited from the <br /> following: <br /> Using illegal drugs on County property; <br /> Manufacturing, distributing, dispensing, selling, possessing, or using a non-prescribed substance, <br /> illegal drug or alcohol, while at work or on or in County property. Reporting for work or <br /> performing work under the influence of a non-prescribed substance, illegal drug or alcohol. <br /> 7.12.1.2 If there is reason to believe that this policy is being violated, the Contractor shall be <br /> required to take immediate action to correct the violation and ensure the County that further violations <br /> will not occur. The remedy shall, at a minimum, require the person or persons who are the subject of the <br /> violation to be banned from the work place. <br /> 7.13 Emergencies <br /> 7.13.1 In emergencies affecting the safety of persons, the Work or property at the site or adjacent <br /> thereto, the Contractor, without special instructions or authorization from the Professional if time or <br /> circumstances do not permit, is obligated to prevent or mitigate threatened damage, injury or loss. The <br /> Contractor shall give the Professional written notice that the emergency provision has been invoked and <br /> shall state the reasons within twenty-four (24) hours of the incident. If the Contractor believes the <br /> emergency results in additional Work, a claim for a Change Order may be submitted in accordance with <br /> the procedures set forth herein. <br /> 7.13.1.1 The Contractor shall immediately notify the Professional of all events involving <br /> personal injuries to any person on the site, whether or not such person was engaged in the construction of <br /> the Project, and shall file a written report on such person(s) and any other event resulting in property <br /> damage of any amount within five(5)calendar days of the occurrence. <br /> 73 <br />