My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/08/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/08/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:43:55 AM
Creation date
3/23/2016 9:03:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/08/2013
Meeting Body
Board of County Commissioners
Book and Page
302
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NO.tif
SmeadsoftID
14229
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r' Sullivan Corp. <br /> GENERAL CONTRACTOR <br /> September 23, 2013 <br /> Mr. Mark Miller <br /> Kimley-Horn and Associates, Inc. <br /> 1920 Wekiva Way, Suite 200 <br /> West Palm Beach, FL 33411 <br /> Re: Indian River County Utilities <br /> R.O. Plants Lime Slurry Injection <br /> Acid Tank Replacement PCO 01 <br /> Dear. Mr. Miller, <br /> We are pleased to submit our bid to perform the additional work shown on the Drawings <br /> and Specifications for the "South R.O. Acid Tank Replacement". We are offering two <br /> separate proposals for two different systems. Option One is based upon using Halar as <br /> the carrier pipe. Option Two 2 is based upon using PVDF as the carrier pipe. <br /> Both systems are based upon using polypropylene as the containment pipe. Our quote <br /> for this work is as follows <br /> Option One = $189,527.00 <br /> Option Two = $198,053.00 <br /> In addition to the above, we shall need an additional 20 calendar days to perform the <br /> work. <br /> If you would like for us to proceed with either of the two options above, please issue <br /> your written acceptance of this proposal and authorization to proceed. <br /> Sincerely, <br /> Obert D. Mullen <br /> Project Manager <br /> cc: Proposed Change Order File, Job 348 <br /> 2001 N.W. 22nd Street- Pompano Beach, FL'33069 <br /> Phone 954-975-0388 - Fax 954-975-3333 176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.