Laserfiche WebLink
OPTION 1 <br /> Description Labor Material <br /> Temporary Acid System 12,500.00 <br /> Tank 51,063.00 <br /> Pipe,Valves, Fittings 23,192.00 <br /> Painting 31,050.00 <br /> Instrumentation/Controls 3,304.00 <br /> Electrical 4,467.00 <br /> Concrete Work 4,769.00 <br /> Piping&Tank Labor 28,584.00 <br /> Subtotal 158,929.00 <br /> 15%OH& P 25,118.00 <br /> Subtotal 184,047.00 <br /> Bond& Insurance 5,480.00 <br /> Total Quoted Amount 189,527.00 <br /> 177 <br />