My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/12/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
11/12/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:52:59 AM
Creation date
3/23/2016 9:05:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/12/2013
Meeting Body
Board of County Commissioners
Book and Page
215
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NU.tif
SmeadsoftID
14235
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Landfill <br /> CeU 1 East-West Rain Flap Removal <br /> Bid Form(Note 1) <br /> Estimated unit <br /> Item Description Quantity Unit Cost Cost <br /> (Note In <br /> 1 Mobilization/Demobilization(Note Ell) 1 Lump Sum "3$`Do 3 S*b0 <br /> 2 Liquid Dewatering/Purnping(Note IV) TBD Truckloads 'Z2.5'a Z.2.5d <br /> 3 Rain Flap Removal(Note V) 3 Days 3 5 0 0 [0...T 0 0 <br /> 4 Materials(Note VI) I Lump Sum $73' Q7 S` <br /> 5 Sligo Submersible Pump(SSR Series 1 PSF)(Note Vin 1 Lump Sum 2 SOO Z rOO <br /> Total Q (Z S <br /> Notes: <br /> I Bidders shall provide list of equipment proposed for the construction activities utcicuding earthwork and geosynthetics for the work <br /> described in this Bid Foran and shown on the Construction Drawings. Bidders shall also include the names and addresses of <br /> subconsultarils they propose for this project. <br /> U Quantities presented herein are estimated quantities and should be verified by Contractor. If quantities are found to be different, <br /> Contractor shall notify Engineer and Owner prior to starting work. Quantities that are not provided and that are within the scope of <br /> work shall be estimated and verified by Contractor and brought to Engineer's attention. <br /> III Mobilization/demobilization shall not exceed 20%ofthe total bid price. <br /> IV TBD-to be determined.This item is optional and may or may not be required.Ibis itara involves potential dewatering/pumping of <br /> liquids that may have been accumulated,due to recent rainfall evems,within the southern portion of Cell I(i.e.,area of Cell 1 south <br /> of the east westrain flap)as shown on the Construction Drawings. Liquids sball be pumped to a tanker truck and transpnrtedto the <br /> Bio-solids facility for disposal vdricb is approximately 3,300 ft(0.62 miles)one-way from the rein flop location. Contractor shall <br /> provide unit cost for a tanker truck to pump and transport liquids to the Bio-solids facility,which is located at the landfill facility. The <br /> ++r tanker truck should have the capability to pump the liquids into the truck. However,the landfill operator has two pumps(one 3-in. <br /> pump and one 6-in.pump that could be used if necessary. <br /> V Contractor stall provide equipment and labor fordo removal of rain flap as shown on the Construction Drawings. Equipment used <br /> shall be approved by the Engineer prior to being used The sand along the rain flap shall be carefully removed to expose the tie-in <br /> point between the flap and the cell liner.The flap shall be cut away from the cell liner carefully to avoid any puncturing of the liner <br /> system. Upon flap removal,the geocomposite that had been bent up behind the flap shall be tblded down But onto the liner against <br /> the existing geocomposite termination point. In orderto patch the geocomposite back together prior to reinstalling the sand cover, <br /> place a cap strip of geotextile(ti-oz/sy minimum)or approved equivalent over the seam and sew it into position. The Contractor shall <br /> ensure that no sand will infiltrate the geocomposite in the area of the patch. The Contractor shalt also provide the required geotextite <br /> material.Any excess sand from the rain flap/berm shall be sporead and graded into the as-constructed Omer protective layer of the <br /> southern portion of Cell 1. <br /> This item also includes the connection of the leachate collection line as shown in the Construction Drawings.Ibis shalt be <br /> accomplished by cutting and cleaning both ends of the pipe at the liner flap location;providing a spool piece(approximately 7 fl tong) <br /> of 6-in.dia.SDR 11 BDPE pipe and two electro fusion couplers;and connecting the pipe together. The Contractor shall provide <br /> geotextile material to connect the leachate collection"burrito wrap"and shall place the leachate collection gravel around the pipe in <br /> the burrito prior to sewing the geotextile overlap. The Owner will provide the gravel needed to the tie-in location but the Contractor <br /> shall be responsible for placing the geotextile-gravel burrito as shown on the Construction Drawings. The Engineer has estimated <br /> three days for this work,Contractor shall indicate the number of days required for this work <br /> VI This item includes the following materials needed for the project(i)6-in.dia.SDR 11 HDPE spool pieces;(h7 two 6-in.dia.electro <br /> fusion couplers;and(iii)8-Wsy nonwoven geotextila required for the geocomposite tie-in point cap strip and for tying the leachate <br /> collection system gravel burrito together.The Owner will provide the gravel required to complete the burrito wrap.Approxanately <br /> 3.6 cy of gravel will be required to constructed the pipe-gravel burrito in this section;this gravel should be obtained from the rain flap <br /> berm along the leachate corridor plus a small stockpile on site. <br /> VR The Contractor shall provide this leachate pump(see attached Cut Sheet)which will be used as a back-up pump for Cell 1.Ibis is a <br /> submersible pump for leachate collection in the side slope riser of Cell 1. Ibis item is optional and the Owner may elect to have this <br /> purchased as part of this contract. <br /> 200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.