Laserfiche WebLink
ATTACHMENT A <br /> GRANT WORK PLAN <br /> l.- <br /> Project Title: Indian River County Hurricane Repair Project <br /> Project Location: Indian River County R20—R51.3 <br /> Project Background: This Project consist of the restoration and maintenance of approximately <br /> 32,090 feet(6.1 miles)of critically eroded shoreline between FDEP Reference Monuments R20 <br /> and R51.3. The Sector 3 Beach and Dune Restoration Project was constructed in three (3) separate <br /> phases from 2010-2012,placing approximately 550,000 cubic yards of sand in the project area.In <br /> October of 2012,the project was impacted by Hurricane Sandy. Emergency dune nourishment was <br /> conducted jointly under authority granted under the FDEP Emergency Final Order—OGC No. 12- <br /> 1641. Design for a full repair project is ongoing,with construction anticipated for 2014. <br /> The PROJECT shall be conducted in accordance with the terms and conditions set forth under this <br /> Agreement, all applicable DEPARTMENT permits and the eligible project task items established <br /> below. All data collection and processing, and the resulting product deliverables, shall comply <br /> with the standard technical specifications contained in the DEPARTMENT'S Monitoring Standards <br /> for Beach Erosion Control Projects(2004)and Processing Plan and Geographic Information <br /> System Guidelines,unless otherwise specified in the approved Scope of Work(herein after referred <br /> to as SOW)for an eligible PROJECT item. This plan may be found at: <br /> hqp://www.dep.state.fl.us/beaches/publications/pdf/standard.pdf. One(1)original electronic copy <br /> of all written reports developed under this Agreement shall be forwarded to the DEPARTMENT, <br /> unless otherwise specified. <br /> Project Description: <br /> The deliverables listed below are to be completed and approved by the DEPARTMENT by the due <br /> date listed. <br /> 2.0 DESIGN AND PERMITTING <br /> Professional services required for engineering and design, obtaining environmental permits <br /> and other authorizations and the preparation of plans and specifications for erosions control <br /> projects. This item specifically excludes permit application fees or any other fees paid to <br /> the State of Florida. <br /> Performance standard: All deliverables, reports,and monitoring results will be <br /> circulated to the DEPARTMENT for review and comment. When comments are received <br /> from the DEPARTMENT affirming that the deliverable is acceptable,payment will be <br /> authorized. <br /> Financial Consequence: Any work product that does not meet the Performance Standard <br /> will not be eligible for reimbursement. <br /> DEP Agreement No. 14IR2,Attachment A, Page l of 3 <br /> 41 <br />