Laserfiche WebLink
2.1 Design and Permitting of the Restoration <br /> Coastal Planning and Engineering Inc. has been retained by Indian River County to conduct <br /> professional services to assist the COUNTY with timely negotiation of acceptable FDEP <br /> and USACE permits for the proposed Dune and Berm Repair Project. Specific tasks <br /> associated with these efforts include: FDEP and USACE Permit Negotiations and Data <br /> Monitoring Support coordination services through receipt of Agency action. <br /> Deliverable A: One electronic submission of the final design report. <br /> Deliverable cost: $11,747 ($5,873—DEP funds). <br /> Due date: July 31, 2014. <br /> Deliverable B: One electronic submission of 2013 Sector 3 beach profile monitoring <br /> surveys from Morgan&Eklund, Inc. <br /> Deliverable cost: $17,050($8,525—DEP funds). <br /> Due date: July 31, 2014. <br /> Deliverable C: One electronic submission of the pre-application meeting minutes. <br /> Deliverable cost: $5,991 ($2,995—DEP funds). <br /> Due date: July 31,2014. <br /> Deliverable D: One electronic submission of the environmental assessment. <br /> Deliverable cost: $7,594 ($3,797—DEP funds). <br /> Due date: July 31,2014. <br /> Deliverable E: One electronic submission of the permit application. <br /> Deliverable cost: $22,598 ($11,299—DEP funds). <br /> 1"" Due date: July 31, 2014. <br /> Deliverable F: One electronic submission of the RAI responses. <br /> Deliverable cost: $7,967($3,984—DEP funds). <br /> Due date: July 31, 2014. <br /> Deliverable G: One electronic submission of the final construction plans and specifications. <br /> Deliverable cost: $12,498($6,249—DEP funds). <br /> Due date: July 31,2014. <br /> 3.0 Construction <br /> Work performed and costs associated with the placement of fill material and/or the <br /> construction of erosion control structures within the project area.Eligible costs may include <br /> mobilization, demobilization, construction observation or inspection services, beach fill, <br /> tilling and scarp removal, erosion control structures, dune stabilization measures and native <br /> beach-dune vegetation. Construction shall be conducted in accordance with any and all <br /> permits issued by the Department. <br /> Performance Standard: Work products(Deliverables)must meet acceptance standards of <br /> the engineer, building code inspector, Joint Coastal Permit, or a combination of these, as <br /> required,to assure all project-related construction is completed to desired specifications. <br /> Financial Consequence: Any work product that does not meet the Performance Standard <br /> will not be eligible for reimbursement. <br /> *4,► <br /> DEP Agreement No. 14182,Attachment A,Page 2 of 3 <br /> 42 <br />