Laserfiche WebLink
PREPARED FOR: <br /> MAIN BREAKER 200A-2P, 10 <br /> PANEL RATING: 1Z./240V, 60 HZ 10.200A PANEL PP-1 INSIDE PPG CABINET Sprint' _ <br /> LOAD(VA) LOAD(VA) <br /> POS. SERVING BREAKER WIRE SIZE&TYPE A B POS. SERVING BREAKER WIRE SIZE&TYPE <br /> A B <br /> 1 SPARE 70A-2P - - 7 EXIST.SURGE SUP. 60A-2P EXISTING 0 1 INTERNATIONAL BOULEVARD <br /> 2 8 (TVSS) SUITE #800 <br /> 0 MAHWAH, N.J. 07495 <br /> 3 EXIST. GEN.BLOCK HTR. 20A-1P EXISTING 1200 9 EXISTING TELCO FAN IOA-1P EXISTING 180 <br /> CONSULTANT: <br /> 4 EXIST.GEN.CHARGER 20A-1P EXISTING 1000 10 EXISTING CFI RECEPT. 15A-1P EXISTING 180 <br /> 5 NEW ERICSSON RES 100A-2P (3)#2&/6 IN 2-C. 9600 11 6102 CABINET EXISTING LIGHT 20A-1P EXISTING 400 [Pei6 <br /> 9600 12 SPARE 20A-IPMTl aMNRM6MPnIe24D <br /> 13 SPACE <br /> 14 SPACE _ _ _ IImsw�,FL va2a <br /> T°L 951.S77A655 Fa2854.51T.48S8 <br /> 75 SPACE - - - 16 SPACE _ _ _ BTATII OF FIL—Acd e8o8ssa <br /> 17 SPACE - - _ 18 SPACE w.,gegl.enn°MIMM.oan <br /> EXISTING 2DOA,240V EXISTING UTILITY 19 SPACE - - - 20 $PACE - <br /> UTILITY METER SERVICABLE TO - <br /> METER 21 SPACE - - - 22 SPACE _ _ <br /> SITE NAME: <br /> 23 SPACE - - - 24 SPACE GIFFORD WATER TANK <br /> EXISTING 200A-2P - <br /> NEMA 3R ENCLOSED NOTE: TOTAL VA 11380 10780 SITE NUMBER: <br /> MAIN FUSED EXISTING H4 CU. 1)ALL WIRES AND CONDOR SIZES SHOWN TO BE COORDINATED WITH THE EQUIPMENT CABINET MANUFACTURER TOTAL AMPS PER PHASE 95 90 MI6OXC24o <br /> DISCONNECT SWITCH GROUND ELEC. SPECS PRIOR TO INSTALLATION. V ALIL'7 <br /> EXISTING 200A-2P CONDUCTOR IN 3/4' 2)PANEL SCHEDULE IS FOR REFERENCE ONLY. EXACT BREAKER POSITIONS MAY VARY ON-SITE. TOTAL AMPS g2 <br /> GOND-VERIFY AND <br /> AUTOMATIC TRANSFER 3)PANEL SCHEDULE REPRESENTS FINAL PHASE AS DEPICTED IN 3/A-3 IN WHICH THE EXISTING BTS CABINETS SITE ADDRESS: <br /> SWITCH TEST- REPLACE IF HAVE BEEN REMOVED. <br /> REQUIRED 4690 28TH CT. <br /> EXISTING 200A-2P <br /> VERO BEACH,FLORIDA 32948 <br /> GEN.CIR.BREAKER IAN RIVER COUNTY <br /> EXISTING 200A GEN. EXISTING(2)5/e"X 2 PANEL SCHEDULE(FINAL PHASE) M <br /> PLUG EWSTI IO-0"D.DRIVEN N.T.S. <br /> I GENERATOR GROUND ELECTRODES <br /> ART <br /> REFER TO PANEL IIIII���� EX ISTING 200A-2P �e2 `%77417 111 7 11 7 7 77777 <br /> SCHEDULE FUTILITY CIR.BREAKER <br /> PROVIDE NEW OR OUTLINE OF EXISTING .• C EIVS•C <br /> REUSE EXISTING POWER CABINET •"��' Fv <br /> 100A-2P CIR. MAIN BREAKER 200A-2P, 10 N0. 62209 <br /> BREAKER I COORDINATE WIRE PANEL PP-1 INSIDE PPC CABINET, <br /> EXISTING BRANCH L---_- SIZE AND CONDOR PANEL RATING: 120/240V,60 HZ 10,200A %� STATE OF Z �� <br /> CIRC. LOAD SIZE WITH EQUIP. <br /> CENTER(PANEL MANUFACTURER MIN. LOAD(VA) i�4n"e"e<ORIpP„•'\��� <br /> PP-1) TELCO (3)I2 AWG THHN LOAD(VA) .• <br /> CABINET AND(1)/6 AWG POS. SERVING BREAKER WIRE SIZE&TYPE A B POS. SERVING BREAKER WIRE SIZE&TYPE A B '���`(3XQ e• ; ��, <br /> GROUND IN 2"RMC <br /> A.F.G.AND RNC B.F.G. 1 EXISTING BTS 70A-2P EXISTING 6720 7 EXIST. SURGE SUP. 60A-2P EXISTING 0 <br /> 2 6720 8 (TVSS) 0 <br /> µWgNG <br /> 3 EXIST.GEN.BLOCK HTR. 20A-1PEXISTING 1200 9 EXISTING TELCO FAN IOA-1P EXISTING 180 gEOSTEo ENGNEEq <br /> a zLOROa <br /> NEW 2"RMC A.F.G <br /> 4 NEW CEN.CHARGER 20A-1P EXISTING 1000 10 EXISTING GET RECEPT. 15A-IP EXISTING 180 �8 <br /> AND RNC STRI g NEW ERICSSON RBS 100A-2P 3 2& 6 IN 2"C. 9600 11 EXISTING LIGHT 20A-IP EXISTING 400 <br /> WITH PULLSTRING ()A A <br /> NEW ERICSSON NEW ERICSSON 6102 CABINET e <br /> BBS 6102 RBS 6102 6 9600 12 SPARE 20A_IP <br /> 13 SPACE SPACE <br /> 15 SPACE DRAWN BY:WJ DATE DRAWN:05/12/12 <br /> CONNECTION INSTALLED - i6 SPACE - - - REVIEWED BV: CC APPROVED BY: Rl <br /> IN ALLATIERICSSON NEW 2"RNC 77 SPACE - 1B SPACE - - - MH PROJECT A:712}001,00 <br /> INSTALLATIONS 19 SPACE <br /> w/PULL-STRING TO - - - 20 SPACE _ _ _ REVISION <br /> FIBER DEMARC NO DESCRIPTION BY DATE <br /> LOCATION. REFER TO 21 SPACE - - - 22 SPACE - - - A 909.CD SUBMITTAL wJ 05/14 12 <br /> PIAN DRAWINGS FOR 23 SPACE - - - 24 SPACE 0 FINAL MU 07/25 12 <br /> NOTE: FIBER DEMARC - - - <br /> 1 FINAL WJ 09/27/12 <br /> SEE SHEET 1/E-t FOR 1 N AN NOTE: TOTAL VA 18100 17500 2 U.S.G. COMMENTS CA 06/12/13 <br /> ADDITIONAL LOW VOLTAGE ROUTE 1)ALL WIRES AND CONDUIT SIZES SHOWN TO BE COORDINATED WITH THE EQUIPMENT CABINET MANUFACTURER TOTAL AMPS PER PHASE 151 id6 <br /> CONNECTIONS FROM THE SPECS PRIOR TO INSTALLATION. <br /> RBS 6102 2)PANEL SCHEDULE IS FOR REFERENCE ONLY, EXACT BREAKER POSITIONS MAY VARY ON-SITE. TOTAL AMPS 148 <br /> 3)PANEL SCHEDULE REPRESENTS TEMPORARY PHASE AS DEPICTED IN 2/A-3 IN WHICH THE MAXIMUM <br /> ELECTRICAL LOAD WILL BE PRESENT. !THEFT TITLE: <br /> POWER/TELCO <br /> DIAGRAMS <br /> 3 SINGLE LINE DIAGRAM PANEL SCHEDULE(TEMPORARY PHASE) SHEET NUMBER <br /> N.T.S. <br /> N.T.S. E-2 <br />