My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/12/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
11/12/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:52:59 AM
Creation date
3/23/2016 9:05:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/12/2013
Meeting Body
Board of County Commissioners
Book and Page
215
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NU.tif
SmeadsoftID
14235
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYMBOL DESCRIPTION SYMBOL DE5CRIPTIDN GROUNDING NOTES: PREPARED FOR: <br /> NEW RRU(EYP. EACH <br /> SECTOR).SEE SHEET ® COPPER GROUND ROD ® TEST WELL 1. ALL DOWN CONDUCTORS AND GROUND RING CONDUCTOR <br /> A-7 FOR <br /> NNECT PER SHALL BE#2 A-G.SOLID, <br /> CONFIGURATION , MABARE.E COPPER.NUFACTURER SPECS GROUND BAR CONNECTIONS TO GROUND RINGSHALLBEEXOTHERMICALLY <br /> WELDED.CONDUCTOR SHALL A MINIMUM DEPTH BELOW GRADE Sprint` <br /> CwOWELD CONNECTION OF 30 INCHES CT TO THE LEDGE. MINIMUM BEND RADIUS SHALL <br /> PROPOSED PANEL EXISTING TOWER GROUND ■ MECHANICAL CONNECTION BE 8 INCHES. CONDUCTOR SHALL BE AT LEAST 24 INCHES FROM <br /> OR DISH ANTENNA ANY FOUNDATION. <br /> BUS BAR AT BASE OF <br /> (iYP. EACH TOWERSEE DETAILS ON (DOUBLE HOLE LUG) <br /> . <br /> SECTOR). SHEET E-5. FIELD VERIFY h TIE INTO EXISTING GROUNDING SYSTEM 2. ELECTRICAL GROUND ROD SHALL BE COPPER CLAD STEEL. 1 INTERNATIONAL BOULEVARD <br /> SEE SHEET A-7 HARGER,ThB, ERICO OR EQUIVALENT, <br /> FOR PROPOSED SUITE #'800 <br /> CONFIGURATION 3.WHERE MECHANICAL CONDUCTOR CONNECTIONS ARE SPECIFIED, MAHWAH. N.J. 07495 <br /> BOLTED,COMPRESSION-TYPE CLAMPS OR SPLIT-BOLT TYPE <br /> CONNECTORS SHALL BE USED. CONSULTANT: <br /> 4.GRIND OFF GALVANIZING IN AFFECTED AREA. EXOTHERMICALLY [PH R2 CONDUCTOR AT 6 INCHES ABOVE GRADE OR <br /> FOUNDATION,WHICHEVER IS HIGHER. COLD-GALV AFTER. MORPIHIER6HFIELD <br /> EXOTHERMICALLY WELD OTHER END TO GROUND. TIN SoHo U=Ilr D-. 245, <br /> PI•nb1M.FL J3324 <br /> 5.GROUND CONDUCTORS ON EXTERIOR WALL OF SHELTER SHALL TeL8 ?TAW FA 954.5TT.4556 <br /> BE ENCASED IN 3/4"PVC CONDUIT TO GRADE. MOUNT PVC WITH STwOF PLORowCM o44•e5•e <br /> 02 AWG STRANDEDEXISTING GUYED GALVANIZED "C"CLAMPS.SEAL TOP ENDS. momeo ne YneM.mm <br /> GREEN JACKET TOWER <br /> COPPER BONDING N2 AWG SOLID TINNED 6. FOLLOWING COMPLETION OF WORK,CONDUCT GROUND TEST. <br /> RRU TO ANTENNA COPPER BONDING MANAGER <br /> WIRTTEN TEST TO CONSTRUCTION MANAGER AND PROJECT <br /> GROUND BAR(TYPTOR) PANEL ANTENNA TO MANAGER. <br /> SITE NAME- <br /> EACH s6c7oR) ANTENNA GROUND BAR <br /> GIFFORD WATER TANK <br /> (TVP, EACH SECTOR) 7. ALL GROUNDING WORN SHALL COMPLY WITH CARRIER(S) <br /> NOTES: STANDARDS. <br /> SITE NUMBER: <br /> EXISTING ANTENNA EXISTING ANTENNA 1. CONTRACTOR TO VERIFY EXISTING 8.GROUNDING REQUIREMENTS SHOWN ON THIS PLAN ARE FOR ■■'CO�/�e�^O <br /> (TYP.) SEE SHEET GROUND BUS BAR NEAR LUG SPACES ARE AVAILABLE ON ITEMS THAT ARE LOCATED NEAR GRADE LEVEL AND THAT NEED TO IY� v A L'1 <br /> A-7 FOR EXISTING AT TOP OF TOWER WITH GROUND BAR.ADD ADDITIONAL BUS BE TIED TO THE BELOW GRADE GROUND RING. <br /> CONFIGURATION COAX GROUND KIT. SEE BAR IF NO LUG SPACES ARE SITE ADDRESS: <br /> DETAILS ON SHEET E-5. AVAILABLE. 9. UNLESS NOTED OTHERWISE.ALL GROUNDING SHALL BE IN 4690 28TH CT. <br /> 2. ANTENNA GROUNDING CONNECTIONS ACCORDANCE WITH SPRINT'S SSEO DOCUMENTS 3.018.02.004 VERO BEACH,FLORIDA 32948 <br /> SHOWN ARE NOT EXACT TO THIS "BONDING,GROUNDING AND TRANSIENT PROTECTION FOR CELL IAN RIVER COUNTY <br /> SITE. FOR EXACT ANTENNA LAYOUT SITES",AND 3.018.10.002 "SITE RESISTANCE TO EARTH TESTING". <br /> REFER TO SHEET A-7 ALL GROUNDING SHALL ALSO COMPLY WITH ALL STATE AND LOCAL <br /> 2 ANTENNA GROUNDING PLAN CODES,AND THE NATIONAL ELECTRICAL CODE(NEC). M <br /> SCALE: N.T.S 10.THE GROUND RING SHALL BE INSTALLED WITHIN 1 <br /> INCHES FROM THE EQUIPMENT PAD FOUNDATION OR E 8 T ` e` A1111111111z <br /> PLATFORM. , ,All W T2VY, <br /> 11. TH <br /> GROUND RODS SHALL NEVER BE SPACED HORIZONTALLY =AAS y� <br /> GROUNDING LEGEND: aosER THAN TwcneLE E GROUND ROD LENGTH. C E tv <br /> _ f"c _ <br /> SYMBOL DESCRIPTION 12.UNLESS NOTED OTHERWISE,ALL GROUNDING CONNECTIONS �• NO 62209 <br /> EXOTHERMIC WELD SHALL BE MADE BY AN EXOTHERMIC WELD. <br /> i —�— GROUND CONDUCTOR 13.NOTIFY THE CONSTRUCTION MANAGER 24 HOURS IN ADVANCE STATE OF <br /> MECHANICAL CONNECTION WHEN THE BURIED GROUND RING IS INSTALLED SO THAT A <br /> GROUND ROD EXOTHERMICALLY REPRESENTATIVE CAN INSPECT THE GROUND RING BEFORE IT IS •. (QR)OP <br /> WELDED TO GROUND RING BACKFILLED WITH SOIL. '��i Xn.S ••e„ G\� <br /> A CONNECTION PER , SAO •• A ` <br /> MANUFACTURER SPECS 14.RESISTANCE TO EARTH SITES. <br /> TESTING IS REQUIRED PER SNC <br /> NEW ERICSSON ' <br /> RBS 6102 CABINET EXISTING STANDARDS ON ALL NEW N2 AWG SOLID BARE TINNED COPPER GROUND YAN W, <br /> REFER TD SHEET RING REGISTERED ENGNFER <br /> srA P GF namon <br /> A-3 FOR 1.1T <br /> CONFIGURATION NEW GPS ANTENNA NOTE: EIe220B <br /> PROPOSED METALLIC CONDUITS AND <br /> NEW IN AWG STRANDED GREEN JACKET COPPER PROPOSED BRACKET SHALL BE BONDED <br /> BONDING GPS ANTENNA S COAX PIPE TO NEW TO EXISTING GROUND RING USING A 2 <br /> GROUND BAR. BOND GPS COAX TO GROUND BAR WITH O _ e <br /> �6 AWG GROUND KIT AWG SOLID TINNED COPPER CONDUCTORS. <br /> PROVIDE A PARALLEL TYPE EXOTHERMIC •DRAWNNBBY,WJDATE DRAWN:05/12/12 <br /> NEW GROUND BAR MOUNTED ON EXISTING POST WELD AT GROUND RING AND U.L <br /> NEW(2)02 AWG SOLID BARE TINNED COPPER APPROVED GROUNDING CLAMP AT REVIEWED BY: CC APPROVED BY: RL <br /> LCONDUCTORS BONDING NEW GROUND BAR TCI GROUND CONDUIT. MH PROJECT 7123001.00 <br /> RING <br /> I1 REVISION <br /> EXISTING CONCRETE PAD N DESCRIPTION BY DATE <br /> NEW 2 <br /> ()H2 AWG COPPER BONDING -----"--'—' NEW ERICSSON BBS 6102 BATTERY CABINET. REFER TO A 90x CD SUBMITTAL WJ 05 14 12 <br /> NEW EQUIPMENT CABINET TO <br /> SHEET A-3 FOR EXACT CONFIGURATION 0 FINAL HU 07/25 12 <br /> E%ISTING EXTERIOR GROUND RING, 1 FINAL WJ 09/27 72 <br /> EXACT CONDUCTOR TYPE AND <br /> NOTE: 2 U.S.C.COMMENTS CA 06/12/13 <br /> CONNECTION TO CABINET PER NOTE: IF EXISTING GROUND BAR IS PRESENT IN <br /> MANUFACTURER SPECS.PROVIDE CABINET,N-FRAME.AND GPS ANTENNA EQUIPMENT AREA, BOND GPS ANTENNA <br /> EXOTHERMIC WELD A7 GROUND RING. LAYOUT SHOWN I$NOT EXACT TO THIS MOUNTING PIPE.GPS COAX GROUND KIT <br /> SITE. FOR EXACT CABINET LAYOUT REFER EXISAND NEW EQUIPMENT CABINETS TO SHEET TITLE: <br /> TO SHEET A-3. CONNECTION, <br /> GROUND BAR WITH MECHANICAL GROUNDING PLAN <br /> CONNECTION. <br /> .� EQUIPMENT GROUNDING PLAN SHEET NUMBER <br /> N.T.S E-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.