My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/12/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
11/12/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:52:59 AM
Creation date
3/23/2016 9:05:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/12/2013
Meeting Body
Board of County Commissioners
Book and Page
215
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NU.tif
SmeadsoftID
14235
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE: PREPARED FOR: <br /> SURGE ARRESTER GENERAL CONTRACTOR SHALL <br /> U—BEAM REFERENCE SECTION 3.5 <br /> "EARTH GROUNDING THE BASIC BASE NOTE TO CONTRACTOR <br /> FRAME`OF THE ERICSSON GBF QD RRU REQUIRES SFP PART fl; RDH <br /> INSTALLATION DOCUMENTS, FOR ALL 102 47/2 OPTICAL TRANCIEVER Sprint! <br /> GBF(GLOBAL CONNECTION SPECIFICATIONS. ONLY.DO NOT SUBSTITUTE <br /> BASE FRAME) HEX CAP <br /> BOLT <br /> WASHER =GROUND <br /> ND BAR <br /> AND BARINSTIN A SSS i INTERNATIONAL BOULEVARD <br /> OUND BAR IN THE <br /> BS AND TIE INTO �� RRUS. PER PLAN SUITE /f800 <br /> D RING. MAHWAH. N.J. 07495 <br /> CPSLIGHTNING ARR STOR INSTALLATION LUG CONNECTION CONSULTANT: <br /> 1. INSTALL THE CPS LIGHTNING ARRESTOR <br /> ONTO THE U—BEAM OF THE BASE FRAME GROUNDWIRE, PER PLAN <br /> AS SHOWN IN THE DIAGRAM BELOW AND <br /> TORQUE TO 10 NM. MORRIEON HCRSMFIELO <br /> LUG CONNECTION 2. INSTALL THE GPS ANTENNA CABLE NOTE: Txo 9artUNnntly fMre.SMle 245, <br /> IL <br /> THROUGH THE CABLE ENTRY AND GENERAL CONTRACTOR SHALL REFERENCE Tet eeo.1.46M 1. <br /> BSeln.a65a <br /> CONNECT TO THE SURGE'SIDE OF THE SECTION 8.3.2:EARTH GROUNDING THE STATEa RRROA cot e000eset <br /> LIGHTNING ARRESTOR. RRUS 11"OF THE •'ti•+.n•mluNieMANdeem <br /> GROUNDWIRE. 3. CONNECT THE COAX CABLE TO THE GPS ERICSS11 RRUS INSTALLATION DOCUMENTS, <br /> 6 GBF DETAIL PER PUN RECEIVER NI THE"PROTECTED'SIDE OF FOR ALL CONNECTION SPECIFICATIONS. <br /> HE LIGHTNING ARRESTOR. 5 RRU GROUNDING DETAIL <br /> SCALE.N.T.S SCALE: N.T.S SITE NAME: <br /> NOTE: <br /> GIFFORD WATER TANK <br /> GENERAL CONTRACTOR SHALL NOTE: SITE NU/MBBEI�R:/� <br /> REFERENCE SECTION 8 GENERAL CONTRACTOR SHALLERIMI6OXCLYO <br /> GROUNDING THE CABINET' LA THE REFERENCE SECTION 10 <br /> DOCUMENTS, <br /> RBS 6102 INSTALLATION 'CONNECTING THE POWER SUPPLY' SITE ADDRESS' <br /> DOCVMENTIO FOR ALL CONNECTION OF THE ERICSSON RBS 6102 <br /> SPECIFICATIONS. INSTALLATION DOCUMENTS, FOR ALL 4690 2TH FLORIDA CT. <br /> VER:BEACH, F32948 <br /> TM INLET COVER CONNECTION SPECIFICATIONS. <br /> IAN RIVER COUNTY <br /> Y <br /> 9® <br /> CROUNDWIRE,PER PUN 7,p '• <br /> MZO S <br /> ..... <br /> uT�.,p, <br /> 1`3 y P•• • ,N <br /> POWER CONNECTOR N0. 62209 _ <br /> LUG CONNECTION STRIPPED CABLES FROM — <br /> DC POWER SUPPLY STATE OF •� <br /> ,O <br /> �,•:o<ORIOP��?�j <br /> 4 RBS GROUNDING DETAIL 3 POWER CONNECTION AT RRUS <br /> SCALE.N.T.S SCALE:N.T.S <br /> REGISTERER ENGNEER <br /> STATE OP RAMroA <br /> PEtetMe <br /> CABLE CLAMP NOTE: <br /> NOTE: INSCRIPTION <br /> PCU AC(POWER ® GENERAL CONTRACTOR SHALL <br /> CONNECTION GENERAL CONTRACTOR SHALL PCF(POWER REFERENCE SECTION 10 <br /> REFERENCE SECTION 10CONNECTING "iO� �•q ~�•��_•��� <br /> UNR AC) 00000 `CONNECTING THE POWER SUPPLY" CONNECTION FILTER) OF THE ERICSSONE RBSW6R1O2UPPLY DRAWN BY:WJ�•�DATE DRAWN:05/12/12 <br /> OF THE ERICSSON RBS 6102 CABLE GLAND INSTALLATION DOCUMENTS,FOR ALL REVIEWED BY: CC APPROVED BY: RL <br /> 0 0 m 0 INSTALLATION DOCUMENTS, FOR ALL CONNECTION SPECIFICATIONS. <br /> CONNECTION SPECIFICATIONS, STRIPPED MH PROJECT N:7123001.00 <br /> CABLES <br /> TERMINAL <br /> 0 FROM DC POWER ® REVISION <br /> BLOCKS SUPPLY NO DESCRIPTION BY DATE <br /> A 90%CD SUBMITTAL WJ 05 14/12 <br /> 0 FINAL HU07 25 12 <br /> 7 FINAL WJ 09/27 12 <br /> OVP INLETS, 2 U.S.G.COMMENTS CA 06/12 13 <br /> SHEET TITLE: <br /> ELECTRICAL DETALS <br /> 2 AC POWER CONNECTION AT RBS DC POWER CONNECTION AT RBS SHEET NUMBER: <br /> SCALE:N.T.S SCALE: N.T.S. E— <br /> w <br />
The URL can be used to link to this page
Your browser does not support the video tag.