Laserfiche WebLink
IRCDUS-BID TABULATION-PROJECT UCP4 4096 <br /> US I WIDENING UTILITY CONFLICTS <br /> Feld Associates Fountain Engineering <br /> n neerin Johnson Deal Melvin Bush Young's <br /> Delete Conflict No.20-WM DB vertical deflection P20 <br /> quantity Unit Price Total Unk Priu Total Unk Price Total Unit Price Total Unit Price Total <br /> 8"HDPE OB WM&adaptors/fittings LF $60.60 $8,816.00 $90.09 $13,063.05 $75.00 $10,875.00 $75.45 $10,940.25 $53.00 $7,685.00 <br /> e"PVC WM&Mlfittln s LF $149.00 $7,897.00 $373.75 $19,808.75 $130.00 $6,890.00 $152.85 $8,101.05 $316.00 $16,748.00 <br /> e"M1GV EA $1,450.00 $1,450.00 $1,535.25 $1,535.25 $1,600.00 $1,600.00 $1,105.00 $1,105.00 $1,648.00 $1,648.00 <br /> 8"line stop/plug EA $3,900.00 $7,800.00 $6,365.25 $12,730.50 $5,000.00 $10,000.00 $3,640.00 $7,280.00 $2,806.00 $5,612.00 <br /> Connect to-sting12"x8"TAP SLV&GV STA 628+70,RT LS 56,80l). $6,800.00 $6,900.00 $6,900.00 $8,000.00 $8,000.00 $3,819.00 $3,819.00 $3,394.00 <br /> $3,394. <br /> Remove B"WM valve&fittings LF $40.00 $800.00 $28.75 $575.00 $30.00 $600.00 $50-00 $1,ODO.OD $36.00 $720.00 <br /> Remove 16"casing LF $200.00 $4000.00 $575.00 $11,500.00 $40.00 $800.00 $80.00 $1,600.00 $37.00 $740.00 <br /> Abandon/rout 8"WM/flttin s 1 LF $24.00 $2160.00 $28.75 $2,587.50 $20.00 $1,800.00 $8.35 $751.50 $116.00 $10,440.00 <br /> Reset valve box/replace concrete ad 3 EA $340.00 $1020.00 $385.25 $1,155.75 $400.00 $1200.0 $175.00 $525.00 $275.00 $825.00 <br /> Fire Hydrant Assemblyw/6"GV 1 EA $3700.00 $3,700.00 $4,295.251 $4,295.25 $5,00O.W1 $5,000.00 $3,183MI $3183.00 $3,495MI <br /> $3495.00 <br /> Subtotal $44,443.00 $74,151.05 $46,765.00 $38,304.8 $51,307.00 <br /> Contingency 30% $4,444.30 $7,415.11 $4676.50 $3,830.48 $5130.70 <br /> Total Deduction for Conflict No.20 $48,887.30 $81,566.16 $51 441.50 $42,135.28 $56,437.70 <br /> Total Bid Less Conflict No.20 $1,123,771.55 $1,420,352.74 $1,009,646.00 $1,095,238.76 $835,927.40 <br />