Laserfiche WebLink
ARTICLE 2 ENGINEER <br /> The project has been designed by Schulke, Bittle & Stoddard, LLC, hereinafter called <br /> ENGINEER, and who is to act as OWNER'S representative, assume all duties and <br /> responsibilities and have the rights and authority assigned to ENGINEER in the Contract <br /> Documents in connection with completion of the work in accordance with the Contract <br /> Documents. <br /> ARTICLE 3 CONTRACT TIME <br /> 3.1 The CONTRACTOR shall be substantially completed with the following timeframe <br /> (a) Within 10 calendar days from effective date of Notice to Proceed, <br /> Contractor shall complete the following tasks: <br /> 1. Obtain all necessary permits. <br /> 2. Receive approved shop drawings for all materials and equipment to <br /> be utilized in the job. <br /> 3. Perform all photographic recording and documentation of conditions <br /> prior to construction. <br /> 4. Locate all existing utilities in the area of work. <br /> 5. Submit and secure approval of shop drawings. <br /> 6. Mobilize all labor, equipment, and materials. <br /> 7. Deliver and store all equipment and materials to the job site. <br /> 8. Notify all utilities and other affected parties prior to initiating <br /> construction. <br /> (b) From 16 calendar days to 330 calendar days from the effective date of <br /> Notice to Proceed, the CONTRACTOR shall complete the following tasks: <br /> 1. Install all pipe and appurtenant items. <br /> 2. Perform all testing. <br /> 3. Restore all disturbed areas to their pre-construction <br /> condition. <br /> 4. Correct all deficiencies noted by Engineer. <br /> Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes <br /> Substantial Completion. <br /> (b) From 330 calendar days to 370 calendar days from the effective date of <br /> Notice to Proceed, the CONTRACTOR shall complete the following tasks: <br /> 1. Clean up project area. <br /> 2. Remove all equipment and material from project site. <br /> 3. Perform contract closeout procedures. <br /> 3.2 Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) <br /> constitute Final Completion. <br /> 3.3 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the <br /> MW essence of this Agreement and that OWNER will suffer financial loss if the work is <br /> 00530-2 <br /> 96 <br />