Laserfiche WebLink
CHANGE ORDER No.3 11/19/2013 <br /> DESCRIPTION OF ITEMIZED CHANGES <br /> PROJECT NAME: OLD DIXIE HIGHWAY SIDEWALK IMPROVEMENTS FROM 8TH STREET TO SR 60 <br /> PROJECT NO.1102 / BID NO. 2012052 <br /> FM.#1425710-1-58-01 <br /> r..� CONTRACTOR:Timothy Rose Construction, Inc. <br /> 16th Street/Old Dixie Hiqhwav PiDe Re air <br /> Item No. IDescription Unit Quantity Unit Price Price Increase Price Decrease <br /> PRICE INCREASES <br /> New Item 13 Maintenance of Traffic LS 1 $ 4,600.00 $ 4,600.00 <br /> New Item 14 De-Watering LS 1 $ 9,400.00 $ 9,400.00 <br /> New Item 15 Crane to hold mast arm LS 1 $ 2,700.00 $ 2,700.00 <br /> New Item 16 Labor&equipment to excavate, set pipe and back fill LS 1 $ 30,000.00 $ 30,000.00 <br /> ASPHALT PATCH-BASED ON 25 SQUARE YARDS <br /> New Item 17 14"Cemented Coquina Shell Base 3 lifts LS 1 $ 750.00 $ 750.00 <br /> New Item 18 Asphalt-2-1/2"Su er ave,Traffic level C LS 1 $ 1,850.00 $ 1,850.00 <br /> New Item 19 Demolition and dump fees LS 1 $ 860.00 $ 860.00 <br /> New Item 20 15'R.C.P.-16 L-F. LF 16 $ 51.25 $ 820.00 <br /> New Item 21 Two 2 Concrete collars EA 2 $ 500.00 $ 1,000.00 <br /> New Item 22 Temporary stripe and thermoplastic LS 1 $ 3,540.00 $ 3,540.OD <br /> PRICE INCREASES <br /> TOTAL $ 55,520.00 <br /> F\Public Works1ENGINEERING DIVISION PROJECTSl1102-Old Dixie Hwy Swk 6th St to SR 64lAP\Admim\Change Order511102-Change Order No.3, 11-19-13As 00310-1 46 <br />