Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />.«� State of Florida organized and existing under the Laws of the State of Florida, (hereinaftier called <br />OWNER) <br />and <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the ',Contract <br />Documents. The Work is generally described as follows: <br />Project consists of the removal of existing grass, re -grading, re -grassing by sprigs <br />and irrigation improvements of the existing Football, Senior Softball and Little <br />League Fields at Gifford Park. Also included in this project is the replacement,, of <br />existing dugouts and relocation of existing fencing around Softball Field. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole',or only a <br />part is generally described as follows: <br />Project Name: Gifford Park Ballfields Grading Improvements <br />County Project Number: 1336 <br />Bid Number: 2014015 <br />Project Address: 4715 43rd Avenue Vero Beach, Fl. <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Final Completion, and readiness for final payment as <br />stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Final Completion and Final Payment <br />A. The Work will be completed and ready for final payment in accordance with paragraph <br />14.07 of the General Conditions on or before the 293rd calendar day after the date when <br />the Contract Times commence to run. (minus holidays and suspended time) <br />00520 - Agreement (Public Works) REN 04-07.doc <br />00520-2 <br />F.\Public Works\ENGINEERING DIVISION PROJECTS\1336-Gifford Senior Ballfield\Admin\bid documents\MasterContract\Contract Documents\00520 - Agreement (Public <br />Works) REV 04-07. doc <br />118 <br />