My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/10/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
12/10/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 11:05:31 AM
Creation date
3/23/2016 9:06:41 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/10/2013
Meeting Body
Board of County Commissioners
Book and Page
216
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NX.tif
SmeadsoftID
14238
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRIDGE DESIGN ASSOCIATES, INC. <br />13TH STREET AND 58TH AVENUE BRIDGE REPLACEMENT <br />November 20, 2013 <br />HOURLY BREAKDOWN OF SERVICES <br />EXHIBIT W <br />ACTIVITY <br />SHEET <br /># <br />PROJECT <br />MANAGER <br />PROJECT <br />ENGINEER <br />FIELD <br />REP <br />E.I. <br />CAD <br />TECH <br />TOTAL <br />HOURS <br />BY <br />ACTIVITY <br />LABOR <br />COST <br />BY <br />ACTIVITY <br />$150.00 <br />$115.00 <br />$70.00 <br />$90.00 <br />COORDINATION <br />Ufilfty Coodination <br />WA <br />4.0 <br />4.0 <br />8.0 <br />1 $1,080.00 <br />Permit Meetings / IRFWCD / SJRWMD / ACOE / DE <br />WA 1 <br />4.0 1 <br />1 1 <br />1 <br />4.0 <br />1 $600.00 <br />DESIGN <br />General Notes/ ConstrUdlon Notes / Specdications N/A 2.5 8.0 10.5 $1,295.00 <br />Design Sheet pile wall system for end bent WA 6.0 6.0 $690.00 <br />Design end bent pile ca N/A 6.0 6.0 $690.00 <br />Design superstructure deck slab N/A zo 12.0 14.0 $1,680.00 <br />Design closure pours WA 3.03.0 $345.00 <br />Design post tension system WA 4.0 4.0 $460.00 <br />Design barrier system & guardrail WA zo 4.0 8.0 $760.00 <br />Design slope protection WA 2.0 4.0 6.0 $750.00 <br />PLANS PREPARATION <br />Index of Sheets / Location Ma / Summ of Q B1 6.0 8.0 $540.00 <br />Bridge Cross section existing & prop B2 4.0 4.0 $360.00 <br />General Notes / Design Criteria / Constr. Notes B3 2-0 zo $180.00 <br />Bridge Plan Sheet B4 12.0 12.0 x1,060.00 <br />Bridge Elevation B5 3.0 3.0 $270.00 <br />Substructure Plan B6 6.0 6.0 $540.00 <br />Pile Data Table / Soll Borings B7 6.0 6.0 $540.00 <br />Finish Grade Plan B8 1zo lzo $1,060.00 <br />End Bent Plan & Elevation B9 6.0 6.0 $540.00 <br />End Bent details B10 12.0 12.0 $1,060.00 <br />Superstructure typical cross section B11 4.0 4.0 $360.00 <br />Precast slab layout plan & post tension B12 1 4.0 4.0 $350.00 <br />Precast slab plan elevation B13 6.0 8.0 $720.00 <br />Precast slab details, bar banding diag B14 18.0 18.0 $1,620.00 <br />Sheet pile wall details, notes etc. B15 6.0 6.0 $720.00 <br />Approach slab layout sheet B16 6.0 6.0 $540.00 <br />Index sheets (600,601,614,700-1,700-2, 810 617- <br />8201- 820-2) B24 1 9.0 1 9.0 3810.00 <br />Load Rating Analysis WA 5.0 18.0 21.0 $1,695.00 <br />MISCELLANEOUS <br />Quantities & Estimates WA <br />1.0 <br />2.0 12.0 <br />15.0 $1.220.00 <br />Permit Application &Responses WA <br />4.0 <br />6.0 <br />5.0 <br />17.0 $1,970.00 <br />TOTAL MANHOURS <br />21.5 <br />68.0 28.0 <br />131.0 <br />248.5 <br />DIRECT LABOR COST <br />$3,225.00 <br />$7,590.00 $1,960.00 <br />$11,790.00 <br />$24,565.00 <br />ENGINEERING FEES $24,565.00 <br />S:12006 Jobs%DM24 13th St SW over 58th Ave BfteWl AdminWmpcwIs%ExNbit A Design 11-20-13E)Hbit A Design 11-20-13 <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.