My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/10/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
12/10/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 11:05:31 AM
Creation date
3/23/2016 9:06:41 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/10/2013
Meeting Body
Board of County Commissioners
Book and Page
216
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NX.tif
SmeadsoftID
14238
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRIDGE DESIGN ASSOCIATES, INC. <br />13TH STREET OVER SUB LATERAL B-8 CANAL <br />CONSTRUCTION PHASE <br />November 20, 2013 <br />HOURLY BREAKDOWN OF SERVICES <br />EXHIBIT "B" <br />ACTNITY <br />PROJECT <br />MANAGER <br />PROJECT <br />ENGINEER <br />FIELD REP CAD <br />El TECHNICIAN <br />TOTAL <br />HOURS <br />BY <br />ACTIVITY <br />LABOR <br />COST <br />BY <br />ACTIVITY <br />$150.00 <br />$115.00 <br />$70.00 $90.00 <br />Pre Construction Meeting <br />2.0 <br />2.0 <br />4.0 <br />$530.00 <br />Shop Drawing Reviews <br />8.0 <br />16.0 <br />24.0 <br />$3,040.00 <br />Pile Casting <br />2.0 <br />8.0 <br />10.0 <br />$790.00 <br />Pile Driving <br />16.0 <br />40.0 <br />56.0 <br />$4,640.00 <br />Pile Cas <br />8.0 <br />32.0 <br />40.0 <br />$3,160.00 <br />Pre -Stressed Decks - Casting <br />8.0 <br />16.0 <br />24.0 <br />$2,040.00 <br />Prestressed Decks - Placement <br />8.0 <br />8.0 <br />$560.00 <br />Closure Pours <br />8.0 <br />8.0 <br />$560:00 <br />Post Tensioning <br />B.D <br />8.0 <br />$920.00 <br />-End Closure Pours <br />8.0 <br />8.0 <br />$560.00 <br />Sidewalks <br />16.0 <br />16.0 <br />$1,120.00 <br />Barriers <br />16.0 <br />16.0 <br />$1,120.00 <br />Approach Slabs <br />8.0 <br />8.0 <br />$560.00 <br />Approach Slabs Sidewalk <br />8.0 <br />8.0 <br />$560.00 <br />Approach Slab Barrier <br />8.0 <br />6.0 <br />$560.00 <br />Final Inspection <br />4.0 <br />4.0 <br />8.0 <br />$880.00 <br />Final Report & Certification <br />8.0 <br />8.0 <br />$1,200.00 <br />TOTAL MANHOURS <br />22.0 <br />60.0 <br />180.0 <br />0.0 <br />262.0 <br />DIRECT LABOR COST <br />$3,300.00 <br />$6,900.00 <br />$12,600.00 <br />$0.00 <br />$22,800.00 <br />$22,800.00 <br />PDA TEST (2) $6.300.00 <br />TOTAL $29.100.00 <br />S:t200&JobsV)"24131h St SW over SBIh Ave BrldgeWl Admin\ProposalslExnbit B CPS <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.