My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/12/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
02/12/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 12:54:57 PM
Creation date
3/23/2016 8:55:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/12/2013
Meeting Body
Board of County Commissioners
Book and Page
138
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004MX.tif
SmeadsoftID
14203
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 3.4 IMPACT FEE SCHEDULES REPORT AND PRESENTATION <br /> CONSULTANT shall prepare Technical Memorandum #4 (TM4), Impact Fee Schedules Report. <br /> TM4 shall contain all updated fee schedules and shall document the process used to update the <br /> schedules. CONSULTANT shall submit ten copies of TM4 to COUNTY. After COUNTY <br /> review of TM4, CONSULTANT shall make necessary revisions to the draft, prepare the final <br /> report,-and transmit ten(10) copies of the final report-to COUNTY. -- - - -- <br /> CONSULTANT shall also attend one advisory group meeting and one public meeting with <br /> elected officials/decision makers to present the draft impact fee formulas and fee schedules <br /> developed in Task 3. CONSULTANT shall prepare all presentation material, including Power <br /> Point presentations, presentation boards, and handouts, in a manner that is non-technical and <br /> understandable by the public. <br /> TASK 4—FINAL REPORT <br /> TASK 4.1 PUBLIC HEARINGS <br /> CONSULTANT shall attend two public hearings for adoption of the revised impact fees. At the <br /> hearings, CONSULTANT shall present the proposed impact fees and explain the methodology <br /> employed to develop the fees. CONSULTANT shall prepare all presentation material, including <br /> Power Point presentations, presentation boards, and handouts. <br /> TASK 4.2 DOCUMENT PREPARATION <br /> CONSULTANT shall compile information from Technical Memorandums 1 - 4 and incorporate <br /> that information into a final report. The report shall include all relevant information in the <br /> principal document, with other information/data incorporated in technical appendices. <br /> CONSULTANT shall submit ten copies of the draft report. After COUNTY review, <br /> CONSULTANT shall make necessary revisions to the draft and transmit thirty (30) copies of the <br /> final report to COUNTY. <br /> TASK 4.3 ELECTRONIC DOCUMENT PREPARATION <br /> CONSULTANT shall provide COUNTY with all electronic documents developed throughout <br /> the impact fee update. This shall include database files, electronic spreadsheets, Power Point <br /> presentations, and others. All documents, graphics, charts, and supporting material generated <br /> during the course of this project will be furnished to the COUNTY in formats as identified <br /> below. <br /> Technical Memoranda and Correspondence Microsoft Office 2000 <br /> Spreadsheets Microsoft Excel 6.0/7.0 <br /> Graphics As negotiated (.dxf format preferred) <br /> Maps/GIS ArcMap 10 <br /> Final Reports Microsoft Office 2000 <br /> 7 <br /> 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.