Laserfiche WebLink
VE <br /> INDIAN RIVER COUNTY <br /> Y; DEPARTMENT OF UTILITY SERVICES <br /> f „ AGENDA ITEM <br /> Date: February 8, 2013 <br /> To: Joseph A. Baird, County Administrator <br /> From: Vincent Burke, P.E., Director of Utility Services <br /> Prepared By: Terry Southard, Operations Manager -UD7 9W <br /> Subject: Work Order No. 5— Professional Services to Kimley-Horn &Associates, Inc. for <br /> Acid Tank Replacement South RO Water Treatment Plant <br /> BACKGROUND: <br /> The South County Reverse Osmosis plant (SCRO) has an existing 16,000 gallon bulk acid tank that is over 12 years <br /> old, and is nearing the end of its service time frame. Since this tank has been put into service, process control <br /> operations have changed reducing the need for an acid tank of the same size. <br /> ANALYSIS: <br /> The scope of services for Kimley-Horn&Associates,Inc., (hereinafter referred to as Consultant),will include 4 tasks. <br /> 1) To design plans and specifications for a new tank and associated supply piping;2)coordinate with FDEP;3) <br /> limited construction phase services,and 4)work with contractors on scope of services,review shop drawings,and site <br /> visit once equipment is installed. <br /> Task 1: Review Existing Conditions <br /> Consultant will review existing tank and piping at the South Oslo Road plant and evaluate options for a replacement <br /> tank. Consultant will develop a phasing plan to allow replacement of the existing tank without interrupting services. <br /> Task 2: Design Plans and Specification <br /> Consultant will prepare plans and specifications for a replacement tank. Plans will consist of a site plan,tank supports, <br /> piping,tie-in details,and general details. Photos may be used to depict these details. It is anticipated that <br /> approximately four(4)drawings will be prepared. <br /> Specifications will be prepared and consist of the replacement tank,associated piping,coating of existing containment <br /> area,and demolition of existing tank. <br /> Consultant will provide 90%of the plans and specifications for review and comments as well as final plans and <br /> specifications for construction. Drawings will be provided in electronic(PDF—portable document format)form. <br /> CADocuments and Settings\aobertautsch\Local SettingsUemporary Internet Files\Content.Outlook\UDVB5PN3\Agenda- Kimely Horn SCRO 149 <br />