My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/19/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
03/19/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 1:15:40 PM
Creation date
3/23/2016 8:56:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/19/2013
Meeting Body
Board of County Commissioners
Book and Page
311
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N2.tif
SmeadsoftID
14207
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oslo Road Phase II Roadway Widening <br /> IRC No.0533 <br /> CHANGE ORDER No. 1 <br /> Description of <br /> Itemized Changes <br /> Item No. Description of Change Quanti Unit Unit Price Price Increase Price Decrease <br /> 555-1-1 Directional Bore Less Than 6" LF 278 17.85 4,962.30 <br /> 711-11-111 Traffic Stripe Solid(Thermoplastic) White 6" LF 2,964 0.70 2,074.80 <br /> 711-11-123 Traffic Stipa Solid(Thermoplastic) White 12" LF 186 1.45 269.70 <br /> 711-11-125 Traffic Stipa Solid(Thermoplastic) White 24" LF 14 2.95 41.30 <br /> 711-11-141 Traffic Stripe Ski Thermo lastic hite LF 267 0.20 53.40 <br /> 711-11-211 Traffic Stripe Solid(Thermoplastic) Yellow 6" LF 220 0.70 154.00 <br /> 711-11-241 Traffic Stripe Ski (Thermoplastic)(Yellow) LF 273 0.20 54.60 <br /> 639-2-1 Electrical Service Wire(F&I) LF i 210 1.05 220.50 <br /> 690-32-2 Pole Removal Shallow Bolt On Attachment EA 7 3 1,000.00 3,000.00 <br /> 783-1-123 Fiber Optic Cable F&I 96F LF 990 1 2.15 2,128.50 <br /> 783-1-323 Fiber Optic.Cable 1) 96F LF 130 0.90 117.00 <br /> 430-991-125 HDPE Pipe Culvert Smooth Wall N-12)(18"SS) LF 40 15.75 630.00 <br /> 430-991-133 HDPE Pipe Culvert Smooth Wall N-12)(30"SS) LF 3 36.75 110.25 <br /> FORCEACCOUNT <br /> Remove Tree/Stump/Replace Fence LS 1 1 3,319.17 3,319.17 <br /> 27th Avenue-Drainage LS 1 5,941.48 5,941.48 <br /> 27th Avenue-Utilities LS 1 1 2,921.58 2,921.58 <br /> 27th Avenue-AT&T LS 1 7,546.59 7,546.59 <br /> Embankment CY 15,600 2.10 32,760.00 <br /> Trash Removal November LS 1 47,142.93 47,142.93 <br /> 6"Gate Valves EA 2 1,330.32 2,660.64 <br /> Cut Structure Q S-123 LS 1 473.36 473.36 <br /> Stump Costs 12/31/12 LS 1 2,696.03 2,696.03 <br /> Stump Costs 1/31/12 LS 1 41,763.69 41,763.69 <br /> 1 1/2"Water Service Sta.183+10 LS 1 2,873.26 2,873.26 <br /> Water Main Stub Out LS 1 6,728.44 6,728.44 <br /> 8"Water Main Tie-in 27th Avenue LS 1 5,659.79 5,659.79 <br /> Additional Utility LS 1 12,423.29 12,423.29 <br /> Additional Draina a 0 S-1A LS 1 2,508.54 2,508.54 <br /> Additional Drainage Structure S-501 LS 1 7,093.93 7,093.93 <br /> Remove Existing Striping&Replace West of 43rd Ave. LS 1 3,265.09 3,265.09 <br /> Draina a Structure Grade Chane LS 2 460.00 920.00 <br /> Grove Welders Modify Structure LS 1 1,825.45 1,825.45 <br /> Stump Cost 2/2/12&2/3/12 LS I1 3,306.25 3,306.25 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\0533-Oslo Rd Phase 11(43rd Ave to 27th Ave)Wdmim\agenda items\Change Order Form No 1 Oslo Road ph 11 10-25-12(2) Page 158 <br />
The URL can be used to link to this page
Your browser does not support the video tag.