Laserfiche WebLink
Oslo Road Phase II Roadway Widening <br /> IRC No.0533 <br /> CHANGE ORDER No. 1 <br /> Description of <br /> Itemized Changes Fem No. Description of Chane QUantl Unit Unit Price Price Increase Price Decrease <br /> Mill Operation Assist LS 1 2,524.00 2,524.00 <br /> 42"RCP Plug Removal LS 1 4,233.37 4,233.37 <br /> Thick Ed a Mill LS 1 18,400.00 18,400.00 <br /> HDPE/S105B LS 1 2,372.74 2,372.74 <br /> Remove F Curb 0 Ace Hardware Entrance LS 1 2,553.00 2,553.00 <br /> Purchase 8 Install Reinforcing Steel Bus Shelter LS 1 1,001.94 1,001.94 <br /> Remove Base @ Ace Hardware Entrance LS 1 4,708.73 4,708.73 <br /> FORCE ACCOUNT 300,000.00 <br /> Subtotals 1 301,948.90 438,294.74 <br /> TOTAL CHANGE ORDER#1 ($136,345.84) <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0533-Oslo Rd Phase 11(43rd Ave to 27th Ave)\Admim\agenda items\Change Order Form No 1 Oslo Road ph 11 10-25-12(2) Page 415 9 <br />