My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/19/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
03/19/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 1:15:40 PM
Creation date
3/23/2016 8:56:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/19/2013
Meeting Body
Board of County Commissioners
Book and Page
311
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N2.tif
SmeadsoftID
14207
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1*9W DICIKER00N <br /> March 11,2013 FLORIOA,INC. <br /> A COMPANY OF THE DICKERSON GROUP,INC. <br /> Mr. Deward Howard,Jr.,Manager <br /> Construction Coordination Engineering Division <br /> Indian River County <br /> (840 25'I'Street <br /> Vero Beach, Florida 32960 <br /> RE: Time Delay Impacts <br /> Oslo Road(CR 606)Phase 11 Road Widening <br /> I.R.C.Project#OS33 <br /> DFI Project Number:3924 <br /> Dear Mr. Howard, <br /> As you are aware during the construction of the above referenced project,our construction team <br /> encountered numerous unforeseen conditions that impacted our overall planned work schedule.The <br /> following is a summary of the conditions that impacted the final completion date: <br /> Inclement Weather 38 days <br /> Stump Dump Cleanup 23 days <br /> Drainage Work at S-105 7 days <br /> Extra Thick Asphalt 2 days <br /> 42"HDPE Under 24"RCP 1 day <br /> Added Drainage at S-IA 7 days <br /> Added Drainage at S-501 C 7 days <br /> 42"RCP Plug Removal 3 days <br /> Remove F Curb at Ace Hardware 3 days <br /> Rework Base at Ace Hardware 3 days <br /> Work Directive#1 6 days <br /> Water Main Tie in at 27th Ave. 4 days <br /> Modify Structure S-123 2 days <br /> Additional Utility Work 6 days <br /> 112 days <br /> We respectfully request that 112 calendar days be added to the Allowable Contract Time on the above <br /> referenced project. <br /> May we have your approval for this request? <br /> Sincerely, <br /> Rick Shepherd <br /> Project Manager <br /> Dickerson Florida,Inc. <br /> Cc: File <br /> P.O. Box 910 • Fort Pierce, Florida 34954-0910 <br /> (772)429-4444 Fax(772) 429-4445 <br /> www.dickersonflorida.com 160 <br />
The URL can be used to link to this page
Your browser does not support the video tag.