My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/19/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
03/19/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 1:15:40 PM
Creation date
3/23/2016 8:56:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/19/2013
Meeting Body
Board of County Commissioners
Book and Page
311
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N2.tif
SmeadsoftID
14207
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERSECTION IMPROVEMENTS AT <br /> CR-510 AND US HIGHWAY 1 <br /> AMENDMENT NO. 5 TO THE PROFESSIONAL CIVIL ENGINEERING <br /> GEOTECHNICAL ENGINEERING & LAND SURVEYING SERVICES AGREEMENT <br /> BETWEEN McMAHON ASSOCIATES,INC. & INDIAN RIVER COUNTY,FLORIDA <br /> This is an amendment to the existing Professional Civil Engineering, Geotechnical Engineering and Land <br /> Surveying Services Agreement (AGREEMENT) dated May 17, 2005, between McMahon Associates, Inc. <br /> (ENGINEER) and Indian River County (COUNTY). This amendment addresses changes in "Section I — Project <br /> Limits and Description", "Section III—Scope of Services", "Section IV—Time for Completion," and"Section V— <br /> Compensation,"of this AGREEMENT. <br /> "SECTION I-PROJECT LIMITS AND DESCRIPTION"is being modified to incorporate the following.- <br /> Consultant services are required for the preparation of supplemental design surveys, roadway design plans <br /> with the design of improvements within revised contract limits of the intersection of SR-5/US-1 and CR-510 <br /> (Wabasso Road),in Indian River County,Florida, as last amended on August 12, 2008. The supplemental roadway <br /> improvements consist of the following: <br /> "SECTION III—SCOPE OF SERVICES"is being modified to incorporate the following: <br /> The ENGINEER agrees to perform professional design and related services in connection with the project, <br /> as required and set forth in the following: <br /> B. Design Surveys <br /> The ENGINEER shall provide supplemental design survey services necessary to support and <br /> facilitate contemplated design and permitting activities associated with this supplemental portion <br /> of the project. <br /> 1. Additional survey is also required to support the relocated Pond 7, on the Graves Brothers <br /> property. Horizontal and vertical control will be extended to acquire the necessary <br /> topography and elevation data needed to support the redesign and relocation of this pond. <br /> The effort/fee for the above tasks will be contained under the Lump Sum Components of the Design <br /> Survey,in"Section V—Compensation." <br /> 174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.