Laserfiche WebLink
1"MW Cl. Geotechnical Investigation <br /> The ENGINEER had previously completed and submitted the Soils Conditions Survey for the <br /> project. The supplemental work that is required to address this agreement is related to <br /> modified/relocated pond sites. The related pond in question is Pond 7, located on the Graves <br /> Brothers property, north of CR-510/SR-510 intersection, and west of SR-5/LJS-1, in the <br /> approximate northeast quadrant of the existing Graves Brother property. Additional geotechnical <br /> investigations will be required in this area, to assist the drainage engineer with design parameters <br /> for the modified/relocated Pond 7. <br /> This effort/fee will be listed under the Lump Sum Components of Geotechnical Investigation, in"Section <br /> V—Compensation." <br /> D. Roadway Design/Plans <br /> 15. The ENGINEER shall modify the plans,as requested by the COUNTY,in meeting January 3, <br /> 2013,to include the topographic and drainage features, as stipulated in B. Design Surveys, of <br /> this herein Supplemental Agreement, and including DTM data, as well as incorporating the <br /> Florida Department of Transportation (FDOT) SR-510 Construction Plans, Financial Project <br /> ID# 427022-1-523-01 [ begin project, immediately west of SR-5/US-1, and extending <br /> approximately 2,743 feet east,to the vicinity of the Intracoastal Waterway Bridge(#880052)]. <br /> The following information,enumerates this detail: <br /> a. Additional Survey/Design Plans Incorporation <br /> The ENGINEER shall incorporate in the plans any updates, as noted above, and in <br /> particular, the revisions to the areas of the revised plan limits, and the incorporation <br /> of the FDOT SR-510 Construction Plans, with Financial Project ID#427022-1-523- <br /> 01. <br /> b. Construction Plan Revisions <br /> As part of the construction plan revisions, due to the revised limit of the project, at <br /> its western termini,in the vicinity of 55`b Avenue,the following plan sheets/elements <br /> will require revisions: <br /> • Title Sheet <br /> • Typical Section Sheets <br /> o Revise for station limits <br /> o Add a two-lane transition for NEW beginning of project <br /> • Summary of Quantity Sheets <br /> Summary of Drainage Structure Sheets <br /> 175 <br />