My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/19/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
03/19/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 1:15:40 PM
Creation date
3/23/2016 8:56:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/19/2013
Meeting Body
Board of County Commissioners
Book and Page
311
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N2.tif
SmeadsoftID
14207
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• General Note Sheets <br /> 0 Plan/Profile Sheets <br /> • Miscellaneous Details/Roadway Cross-Sections <br /> • Modified/Relocated Pond 7 Sheets,including conveyance <br /> • Drainage Structure Cross-Section Sheets <br /> • Storm Water Pollution Prevention Plans <br /> • Traffic Control Plans <br /> • Utility Verification Sheets <br /> • Component Plans <br /> o Signing and Marking Plans <br /> o Signalization Plans <br /> o Landscape Plans <br /> o Utility Improvement Plans <br /> 16. The ENGINEER shall modify the plans, as requested by the COUNTY, to provide a 4-lane <br /> roadway to 2-lane roadway transition, at the NEW revised western project termini, in the <br /> vicinity of the 55th Avenue intersection. <br /> 17. The ENGINEER shall modify the plans, as requested by the COUNTY, to address <br /> supplemental storm water design. The revisions required are to address the storm water <br /> drainage design and plan/profile revisions to develop a NEW western termini, in the vicinity <br /> of 55`h Avenue. <br /> The effort/fee for these tasks will be contained in the Lump Sum Components of the Roadway Design, in <br /> "Section V—Compensation." <br /> Additional effort is also required by the ENGINEER to re-do the plans, profiles, and cross-sections, and <br /> project related retention ponds. Any work associated with the retention ponds,are enumerated below. <br /> 176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.