My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/19/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
03/19/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 1:15:40 PM
Creation date
3/23/2016 8:56:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/19/2013
Meeting Body
Board of County Commissioners
Book and Page
311
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N2.tif
SmeadsoftID
14207
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDITIONAL WORK: <br /> In the original Work Order No. 4, Geosyntec was authorized to prepare design and construction <br /> drawings to make enhancements to improve drainage of the new access road to the top of the <br /> landfill. On December 8, 2012, the Board authorized Work Order No. 6 to Geosyntec which <br /> included a task for construction support services for these drainage enhancements and <br /> anticipated utilizing the Board approved contingency funds to have Comanco install a Flexmat <br /> drainage feature along the road. A bid was requested from Comanco; however, it exceeded the <br /> engineer's estimate. Staff is requesting the Board to keep the contingency funds available in order <br /> to complete this work in a timely manner under a separate authorization. <br /> ACCOUNT INFORMATION: <br /> Funding for the Landfill Segment 3 Cell 1 Phase 2 lateral expansion project is budgeted and <br /> available in the SWDD landfill account WIP number which is funded from SWDD assessments and <br /> user fees. <br /> DESCRIPTION ACCOUNT NO. AMOUNT <br /> Phase 2 Cell 1 Segment 3 Landfill Expansion Project 411-169000-10009 $240,648.74 <br /> RECOMMENDATION: <br /> SWDD staff recommends its Board approve the following: <br /> 1. The final payment including the release of retainage to Comanco Environmental Corporation <br /> in the amount of $240,648.74 for the Phase 2 construction of Cell 1 of Segment 3 <br /> Expansion in accordance with Bid No. 2012025. <br /> 2. Authorize the use of the remaining contingency funds in the amount of $364,734.58 to be <br /> allocated in a separate project for the drainage enhancements of the landfill access road. <br /> ATTACHMENTS: <br /> 1) Final Payment Recommendation Letter from Geosyntec <br /> APPROVED FOR AGENDA: <br /> Indian River Co. Approved Date <br /> v <br /> By: Administration /f <br /> oseph . Baird, County Administrator Budget <br /> Legal r (� •(3 <br /> Date SWDD <br /> SWDD Cru t <br /> C41 V 16It�l3 <br /> 266 <br /> SWDD Agenda-Final Pay to Comanco-Cell 1 Segment 3 project Paee—2— <br />
The URL can be used to link to this page
Your browser does not support the video tag.