My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/19/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
03/19/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 1:15:40 PM
Creation date
3/23/2016 8:56:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/19/2013
Meeting Body
Board of County Commissioners
Book and Page
311
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N2.tif
SmeadsoftID
14207
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review of Payment Application#10 <br /> 8 March 2013 <br /> Page 2 <br /> ° - 1. Item 1 — Mobilization and Demobilization: 45% of $85,000 = $38,250. Comanco is <br /> requesting payment for the remaining 45% of the amount for this item. Comanco has <br /> completely demobilized from the site. The work for this item is complete and conforms <br /> to Part 1.03A of Specification Section 01025. This therefore completes work on this <br /> item. <br /> 2. Item 2 — Surveying and As-built Drawings: 10% of $15,000 = $1,500. Comanco is <br /> requesting payment for the remaining 10% of the amount for this item. Comanco has <br /> submitted the as-built drawings for the project to Geosyntec. The work for this item is <br /> complete and conforms to Part 1.0313 of Specification Section 01025. This therefore <br /> completes work on this item. <br /> 3. Item 27K — Electrical, Control Panel, Grounding and Li hg tning Protection: 67% of <br /> $9,000 = $6,030. Comanco is requesting payment for the remaining 67% of the amount <br /> for this item. The work for this item is complete and conforms to Part 1.03K of <br /> Specification Section 01025. This therefore completes work on this item. <br /> 4. Item 28A —2"/4" dia. SDR-17 HDPE Leachate Transfer Pipe: 67 if at $85/If= $5,695. <br /> The work for this item is completed and conforms to Part 1.03L of Specification <br /> Section 01025. The estimated quantity for this item was 40 if and the actual quantity is <br /> 147 If. This is due to the fact that for Item 28B, 4"/6" dia. pipe was replaced by a 2"/4" <br /> pipe after performing design modifications. Therefore item 28B was not charged and <br /> the quantity was moved to this item i.e. 28A. In addition, the alignment of the pipe was <br /> slightly modified due to the redesign associated with relocation of the box culvert. This <br /> redesign resulted in additional pipe length. The adjustment in the total amount for this <br /> item has been included in Change Order #1032. This therefore completes work on <br /> this item. <br /> 5. Item 29 — Regrading; Perimeter Ditch North of Se mg ent 2: 245 if at $ 7.00/cy = $1,715. <br /> Geosyntec had estimated the quantity for this item as 300 If The actual quantity based <br /> on surveying performed by Comanco was 245 If Comanco is requesting payment in <br /> the amount of$1,715 which is less (by $385) than the quantity estimated on the bid <br /> form. The adjustment in the total amount for this item due to reduction in the actual <br /> quantity has been included in Change Order#1032. The work for this item is completed <br /> and conforms to Part 1.03M of Specification Section 01025. This therefore completes <br /> work on this item. <br /> 268 <br />
The URL can be used to link to this page
Your browser does not support the video tag.