Laserfiche WebLink
• The material maybe removed with a dredge,excavator, or other equipment as CONTRACTOR <br /> determines prudent. All material removed must be deposited into the sediment recovery area <br /> unless otherwise explicitly authorized in writing by OWNER. <br /> • Bid questions received after 5:00 PM on Monday, March 25, 2013 will not be answered. <br /> End of Technical Specifications <br /> 5 <br /> f:\public works\keithm\stormwater projects\main relief canal operation\dredging sedimentation basins\contract and work <br /> orders\2013-2014 emc contract\attachment no. 1-technical specifications.doc <br /> 45 <br />