Laserfiche WebLink
CONTRACTOR may store equipment and supplies at PC Main during the term of the Contract if the <br /> storage does not interfere with the operations of the OWNER or IRFWCD. All items stored shall be at <br /> ®...- CONTRACTOR's risk. All protection and security shall be provided by CONTRACTOR. <br /> INSPECTION <br /> Site visits will be made from time to time by OWNER's representatives. <br /> TEMPORARY UTILITIES <br /> Pay for and provide all temporary utilities and electrical service to satisfactorily complete the Work. <br /> Remove the temporary facilities when the Work is accepted by OWNER. <br /> SITE CLEANUP <br /> Furnish all labor,equipment,and materials necessary to cleanup and restore the site and offsite areas as <br /> directed by OWNER after each Work Order is completed and at the end of the Contract period. <br /> MISCELLANEOUS INFORMATION <br /> • The project budget is$27,280 and the County will authorize as many cleaning events during the <br /> contract period as the budget allows. <br /> • CONTRACTOR will not be required to provide a licensed surveyor to determine the final <br /> elevation of the cleaned Work. OWNER will determine the final cleaning depth after <br /> CONTRACTOR states the Work is complete and before payment is issued. If a sediment cell has <br /> not been cleaned as required herein then payment will be prorated based on the actual volume <br /> ..► cleaned. <br /> • The two sediment cells are located approximately 40 to 50 feet apart. <br /> • During cleaning activities, OWNER will try to lower the water level in the canal to approximately <br /> elevation 3.0 NGVD. The bottom of the treatment channel and the top of both sediment cells is <br /> approximately elevation 1.0 NGVD. OWNER cannot guarantee it can lower the water to <br /> elevation 3.0 NGVD under all flow conditions. <br /> • If CONTRACTOR uses a dredge and the dredge pump produces more dewatering water than the <br /> existing sediment recovery area's decant system can handle,the excess water may be pumped <br /> from the sediment recovery area into the Main Canal Screening Facility's influent chamber as <br /> long as discharge turbidity requirements are met. <br /> • OWNER will clean the sediment recovery area prior to each cleaning event. <br /> • Indian River Farms Water Control District owns the canal and it may release water down the <br /> canal from an upstream water control structure if upstream water levels become too high. The <br /> District will provide as much warning notice as possible prior to a release. <br /> 4 <br /> f:\public works\keithm\stormwater projects\main relief canal operatio n\dredging sedimentation basins\contract and work <br /> orders\2013-2014 emc contract\attachment no.1-technical specifications.doc <br /> 44 <br />