Laserfiche WebLink
INDIAN RIVER COUNTY, FLORIDA <br /> MEMORANDUM <br /> TO: Joseph A. Baird, County Administrator <br /> THROUGH: Christopher R. Mora P.E., Public Works Director <br /> p <br /> FROM: James D. Gray, Jr., Coastal Engineer Q <br /> SUBJECT: Memorandum of Understanding between Indian River County and <br /> Sebastian Inlet District for Coordination of Supplemental Downdrift <br /> Nourishment and Related Coastal Activities <br /> DATE: March 20, 2013 <br /> DESCRIPTION AND CONDITIONS <br /> The County and the Sebastian Inlet District (District) desire to enter into a Memorandum of <br /> Understanding (MOU) to cooperate in connection- with obtaining beach comlaatible materials <br /> from the dredging of the Sebastian Inlet sand trap and other approved borrow sources to <br /> partially construct or repair dune projects, previous beach renourishment projects or erosional <br /> hot spots along the County's beaches north of the Florida Department of Environmental <br /> Protection ( FDEP) Reference monument R-40 (Wabasso Beach Park). <br /> The MOU identifies two (2) beach compatible fill placement locations. <br /> N-- • The Primary Fill Placement Location (Bypassing Template) is the area of beach referred <br /> to as Sectors 1 and 2 and will utilize sediments dredged from Sebastian Inlet sand trap. <br /> • The Supplemental Nourishment Fill Placement Location is the area of beach <br /> immediately south of Sectors 1 and 2 extending south to FDEP Reference monument R- <br /> 40 (Wabasso Beach Park). Supplemental Nourishment (in the range of 15,000 cubic <br /> yards) will occur if there is not an adequate area within the Primary fill construction <br /> template; with focused placement in areas of greatest need. Sand sources are <br /> expected to be from upland sand mines. <br /> Figures identifying the location of the Primary and Supplemental fill templates are attached to <br /> the MOU as Exhibit 1 and Exhibit 2. All coastal activities identified in the MOU are guided by <br /> the County's Beach Preservation Plan and the District's Inlet Management Plan and will be <br /> carried out in close cooperation between Indian River County and District staff. <br /> The MOU also provides a mechanism for the County and District to increase State grant funding <br /> opportunities on future beach projects. The State recognizes projects conducted in a manner <br /> that encourages cost-savings, fosters regional coordination of projects, optimizes management <br /> of sediments and project performance, protects the environment, mitigates impacts caused by <br /> modified inlets and provides long-term solutions. The MOU address all of the State grant <br /> funding eligibility requirements. <br /> FAPublic WorksUamesG\Sebastian Inlet District-MOU\Agenda Item\Indian River County and Sebastian Inlet District MOU BCC agenda memo <br /> 3-20-13.docx 141 <br />