Mr.Himanshu Mehta,P.E. <br /> 6 March 2013 <br /> Page 2 <br /> During construction of the Phase 2 project, SWDD requested Geosyntec to assess the condition <br /> of the ditch on the southern side of the vertical expansion access road that goes up the IRCL. On <br /> October 24, 2012, Geosyntec issued a memorandum to SWDD summarizing the assessment of <br /> the erosion and sedimentation issues the access road ditch was experiencing and proposed a ditch <br /> redesign to address the deficiencies of the existing ditch. Based on the performance and <br /> economic evaluations performed, Geosyntec recommended the use of Flexamae lining system to <br /> address the erosion and conveyance deficiencies of the existing ditch. Further, Geosyntec <br /> prepared an engineer's cost estimate (ECE) for performance of the Ditch Work. <br /> In December 2012, during performance of the Phase 2 project, SWDD requested Geosyntec to <br /> obtain a quote for the Ditch Work from the Phase 2 project general contractor Comanco <br /> Environmental Corporation (Comanco). On January 4, 2013, Comanco provided a quote for <br /> performance of the Ditch Work. The total cost from Comanco's proposal was $289,975.00. <br /> Based on the ECE, Geosyntec evaluated Comanco's bid price to be too high and suggested that <br /> SWDD rejects that and pursue other options. Geosyntec summarized Comanco's proposal <br /> evaluation in an 8 January 2013 memorandum to SWDD. <br /> On January 9, 2013, SWDD requested Geosyntec to prepare separate bid documents for the <br /> Ditch Work. Geosyntec subsequently completed the preparation of the bid documents including <br /> a revised bid form, technical specifications and construction drawings for obtaining bids for the <br /> Ditch Work. Geosyntec also revised the ECE in accordance with the revised bid documents. <br /> On January 25, 2013, SWDD requested Geosyntec to forward the bid documents for the Ditch <br /> Work to Republic Services, Inc. (Republic), the operator of the Class I Landfill, to obtain bids <br /> for construction of the Ditch Work under operation contract with SWDD. <br /> SUMMARY AND EVALUATION OF BIDS <br /> On February 22, 2013 the following two general contractors submitted their bids for the Ditch <br /> Work: <br /> • Treasure Coast Construction Management, L.C. (TCCM),Vero Beach,Florida; and <br /> • Golder Associates, Inc. (Golder),Atlanta, Georgia. <br /> In addition to the above two bids, Comanco's bid was considered in the bid evaluation process. <br /> The three bid proposals are presented in Attachment A. SWDD has requested Geosyntec to <br /> review the bids and provide a recommendation to SWDD on the cost proposals. Our evaluation <br /> presented herein is based solely on the copies of the completed bid forms received from SWDD. <br /> FL2054\JL13020 Bid Evaluation <br /> 273 <br />