My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/02/2013 (3)
CBCC
>
Meetings
>
2010's
>
2013
>
04/02/2013 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2022 9:04:14 AM
Creation date
3/23/2016 8:56:34 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/02/2013
Meeting Body
Board of County Commissioners
Book and Page
301
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N3.tif
SmeadsoftID
14208
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICLOS--EDEDUCTIVE <br /> Construction, LI,C l�T PCHM�7 Mo • ( CHANGE <br /> ORDER <br /> PROJECT: Modifications to the Egret Marsh CHANGE ORDER NUMBER: 1 <br /> (Name,address) 7295 4th Street DATE: 11.28.2012 <br /> Vero Beach, FL: ARCHITECTS PROJECT NO 0435A <br /> CONTRACT DATE: 1 1.07.2012 <br /> CONTRACTOR: Close Construction, LLC CONTRACT FOR: <br /> (Name,address) 301 N. W. 4th Ave. <br /> Okeechobee, FL 34972 <br /> The Contract is changed as follows: <br /> The deletion of the vapor barrier, tape and labor and excavating 2" in lieu of 6" <br /> for elevation change in floway and deletion of the mixing of existing material in place. <br /> Delete Vapor Barrier, Tape and Labor(See attached breakdown) ($3,089.00) <br /> Excavate 2" in lieu of 6" off Floway (See attached breakdown) ($3,268.00) <br /> Mix existing material in place ($3,250.00) <br /> Dozer$81.25/hr @ 8 hours = $650.00/day <br /> $650/day x 5 days = $3,250.00 <br /> Change Order Total ($9,607.00) <br /> NOW )riginat(Contract Sum}(Guaranteed Maximum Price)was............. ........ .........................$ 1,288,482.00 <br /> Net change by previously authorized Change Orders..............................................................$ 0.00 <br /> The(Contract Sum}(Guaranteed Maximum Price)prior to this Change Order was.........................$ 1,288,482.00 <br /> The(Contract Sum}(Guaranteed Maximum Price)will be(increased)(decreased) <br /> (unchanged)by this Change Order in the amount of...........................................................$ -9,607.00 <br /> The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order will be............$ 1,278,875.00 <br /> The Contract Time will be(increased)(decreased)(unchanged)by ( )days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is 3.09.2013 <br /> NOTE This summary does not reflect changes in the Contract Sum,Contract Time or Guaranteed Maximum Price which have <br /> been authorized by Construction Change Directive. <br /> _._ .._.... ... ..__....... <br /> OWNER CONTRACTOR <br /> Indian River County Close Construction,LLC <br /> Address Address <br /> 1801 27th Street 301 N.W.4th Ave. <br /> Vero Beach, FL Okeechobee, FL 34972 <br /> BY BY <br /> DATE DATE <br /> 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.