Laserfiche WebLink
Qt z6 <br /> AUk <br /> 5550 415` STREET *VERO BEACH,FL 32967 (772) 562-8814 *FAX(772)562-0173 <br /> CHANGE ORDER# 1 <br /> Date: November 26,2012 Revised 11-29-12 <br /> To: Close Construction, LLC <br /> 301 Northwest 4`f'Ave <br /> Okeechobee, FL 34972 <br /> Re: Modifications to the Egret Marsh Stormwater Park Floway <br /> We hereby agree to make the following changes including labor, materials, equipment and all taxes <br /> to the above referenced project: <br /> 1. Delete Vapor Barrier,Tape and Labor <br /> a. 14 Rolls of Stego 10 Mill Vapor Barrier& Tape ($2,833.00) <br /> b. 2 Labors for 8 Hours ($ 256.00) <br /> Deduct ($3,089.00) <br /> 2. Excavate 2"In Lieu of 6"For Elevation Change in Floway <br /> a. Deduct Loader 2 Days ($ 947.00) <br /> b. Deduct Grader 2 Days ($ 956.00) <br /> C. Deduct Backdump 2 Days ($1,109.00) <br /> d. Deduct One Labor for 2 Days 256.00 <br /> Deduct ($3,268.00) <br /> TOTAL DEDUCT (S 6,357.00) <br /> Subject to Existing Contract Conditions and Exclusions <br /> Close Construction,LLC <br /> BY <br /> Printed Name: <br /> Date <br /> Cathco Inc. <br /> By <br /> Matthew S. Eisert, as agent for Cathco, Inc. <br /> I-Aw Date <br /> 54 <br />