My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/02/2013 (3)
CBCC
>
Meetings
>
2010's
>
2013
>
04/02/2013 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2022 9:04:14 AM
Creation date
3/23/2016 8:56:34 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/02/2013
Meeting Body
Board of County Commissioners
Book and Page
301
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N3.tif
SmeadsoftID
14208
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Pale- o� I <br /> ' <br /> -T No . 4 <br /> CLOSE <br /> CHANGE <br /> ORDER <br /> 0 i F C M-odifications to the Egret Mai sh CHPNGE ORDER l--,',UPIBER: 4 <br /> address? 7295 4th Street DATE: 2.11.2-011 <br /> ........... <br /> "Iefo, Beach. FL ARCHITECTS PROJECT NO 0435A <br /> CONTRACT DATE: 11.07.2012 <br /> CONTRACTOR; Close ConstrUCII011, LLC CONTRACT FOR: <br /> (t,•Ian--P.address) 301 N. VV. 4th Ave. <br /> Okeechobee, FL 349-72 <br /> The Contract is 0hanued as 1`011OWS: <br /> The addition of labor, equipment and materials to complete the following: <br /> 1. additional concrete slab non-reinforced 24' x 15' \X 6" thick <br /> 4,000 psi with fibermesh <br /> Drawdy Concrete Construction ($40/SY x 4.0 SY) $1,600.00 <br /> Change Order Totall: $1,600.00 <br /> The original fContracl.SLIMI(Guaranteed klaxinium Price) was........................._.........._._.......$ 1:288,482M <br /> t,.Iet change by preViouSly authorized Change orders..............................................................$ 0.00 <br /> The(Contract Sum)(Guaranteed fx4aximuni Price)prior to this Change Order was................._....-$ 1,288,482.00 <br /> The iContiact Surn.1(Guaranteed Maximum Price)will be(increased',(decreased) <br /> (unchanged)by this Change Order in tine arn0Ur,.I, .......................................... 1,600.00 <br /> The new(Contract Sum".(Guaranteed N/laximurr,Price)including this Change Order W111 be............ -1,290,082.00 <br /> The Contract Tinicohil be(increased)(decreased)(unchanged',by days. <br /> The date of Substantial Completion as of the date cf this Change Order therefore is <br /> NOTE-1 h;s sum mary does not refleci changes in the Cont(30 SUM.Contract Tirnc or Guaranteed Maximum.Price which have <br /> bier <br /> autharized by Construction Change Directive. <br /> OWNER CONTRACTOR <br /> Indi2nRiver County Close Construction:1-1-C ............. <br /> .................. ......-- <br /> Addre�z Ad di r e s s <br /> 150 1 2 7th Stree. 301 N.W.4th Ave. <br /> -- PL <br /> Verc,0 3acl 13 I'So'hobee, 34972 <br /> Y /e <br /> ..---..... <br /> Dr%TE <br /> .......... <br /> 63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.