Laserfiche WebLink
MM File#1305 <br /> NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> "EXHIBIT 1" <br /> (Scope of Work) <br /> • Project Description <br /> Work Order No. 3 provides for professional engineering services for the surveying, <br /> design, permitting, bidding, and construction services for the Central Regional <br /> Wastewater Treatment Plant's Sludge Holding Tank modifications. <br /> The work to be performed as part of this Work Order will generally include providing <br /> a survey and base plans; preparation of project design and demolitions for the <br /> proposed tank modifications, preparation of contract plans; preparation of <br /> specifications and bid documents; preparation and submittal of permit applications, <br /> assistance during bidding and contract administration/periodic inspection for the <br /> project. <br /> The estimated Construction Cost for the Utility Improvements covered in the Scope <br /> of Services for Work Order No. 3 is $ 400,000.00 <br /> A brief description of the scope of services and deliverables for Work Order No. 3 is <br /> provided below: <br /> • Scope of Services <br /> Task A—Surveying Services <br /> Masteller, Moler, Reed & Taylor, Inc. will perform surveying services of existing <br /> conditions covering the project area showing improvements and necessary <br /> elevations and topo. <br /> Task B — Structural Engineering Services <br /> Masteller & Moler, Inc. will provide for structural engineering services to inspect the <br /> existing sludge holding tanks and provide a brief written report of observations <br /> concerning the structural integrity of the tanks and design structural support system <br /> for tank truck filling pipe. <br /> 77 <br />