My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/14/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
05/14/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 1:48:19 PM
Creation date
3/23/2016 8:57:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/14/2013
Meeting Body
Board of County Commissioners
Book and Page
87
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N8.tif
SmeadsoftID
14213
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit#1 (Scope of Work) Work Order No. 3 <br /> 03/12/2013 <br /> Page 2 <br /> Task C — Electrical Engineering Services <br /> Masteller & Moler, Inc. will provide for electrical engineering services in connection <br /> with removal of existing electrical elements of mechanical equipment and installation <br /> of any new equipment. <br /> Task D — Civil Engineering Services <br /> Masteller & Moler, Inc. will provide civil engineering services covering the design <br /> and preparation of plans and specifications for demolition and construction of <br /> equipment and appurtenances related to the Central Plant's Holding Tanks. The <br /> project elements will generally include: <br /> • Provide specifications for emptying and cleaning sludge holding tanks and <br /> grease and septage receiving tanks. <br /> • Provide for inspection of the sludge holding tanks for structural defects and <br /> structural design services per Task B above. <br /> • Provide for specifications for preparing and coating sludge holding tank <br /> interior wall and ceiling surfaces. <br /> • Provide specifications for painting exterior of sludge holding tanks and grease <br /> and septage receiving tanks. <br /> • Provide plans and specifications for removal of existing: Grit equipment; <br /> Ozone generation equipment; Odor control system on North side of <br /> dewatering building; and Pumps/motors/valves and piping on South and East <br /> sides of sludge holding tanks. <br /> • Fill in concrete pump pit on south side of tanks with compacted soil and <br /> provide for design of concrete slab for tank recirculation system. <br /> • Evaluate, select, and design new mixing system in sludge holding tanks. <br /> • Design new piping systems to: Allow both sludge holding tanks to be used <br /> simultaneously and permit the existing rotary drum thickeners to utilize both <br /> sludge holding tanks. <br /> • Design new dedicated pumps/motors, valves, and piping for conveying <br /> sludge to tank trucks. <br /> • Provide for design of new tank recirculation system and electrical <br /> components including, but not limited to, level alarms for tanks and H.O.A. <br /> pump control switch at loading area per Task C. <br /> • Design new piping system to facilitate sludge transfer into tank trucks <br /> including flow meter at top of filling hill. <br /> • Design of new fence to replace fence on North side of loading ramp. <br /> 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.