My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/18/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
06/18/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:08:50 PM
Creation date
3/23/2016 8:58:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/18/2013
Meeting Body
Board of County Commissioners
Book and Page
347
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004NE.tif
SmeadsoftID
14219
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUILDING DIVISION CUNCO, INC <br /> 5550 41" STREET * VERO BEACH, FL 32967 * (772) 562-8814 * FAX (772) 562-0173 <br /> cathcoinc@bellsouth.net <br /> Date: June 6, 2013 <br /> To: Indian River County Sheriff <br /> 4055 41"Ave <br /> Vero Beach,FL 32960 <br /> Proposal For: IRC Jail Warehouse Expansion <br /> Vero Beach, Florida <br /> We hereby propose to furnish labor and materials for the following: <br /> Warehouse Expansion Building Proposal <br /> 1. Milton Construction $ 129,055.00 <br /> 2. Summit Construction Management, Inc. $ 134,000.00 <br /> 3. RF Concrete Construction, Inc. $ 154,000.00 <br /> Site Work <br /> 1. Sidewalk Demolition $ 330.00 <br /> 2. Fence Removal and Replacement $ 853.00 <br /> 3. Building Pad Grading & Compaction $ 905.00 <br /> 4. Raise Storm Structure $ 600.00 <br /> 5. Concrete Sidewalks $ 265.00 <br /> 6. Final Grading $ 275.00 <br /> Site Work Total $ 3,228.00 <br /> NOTES: <br /> 1. Price is Valid for Work to be Completed by September 2013, Cathco Inc. to be Compensated for <br /> Cost Increases Beyond that Date. <br /> 2. Concrete Sidewalk Cost is Based on Additional Quantity To PO #53265. <br /> 3. No Change To Asphalt Quantity and Cost Per PO #53610. <br /> This proposal subject to acceptance within 30 days and is void ther rat the option of the undersigned. <br /> Approved Signature <br /> M tthew S. ffsert <br /> Vice President <br /> 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.