My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/18/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
06/18/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:08:50 PM
Creation date
3/23/2016 8:58:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/18/2013
Meeting Body
Board of County Commissioners
Book and Page
347
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004NE.tif
SmeadsoftID
14219
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MILTON <br /> C 0 N S T R U C T 1 0 N <br /> (W PROPOSAL FOR CONSTRUCTION SERVICES <br /> June 5,2013 <br /> Cathco, Inc. <br /> 5550 41St Street <br /> Vero Beach, Florida 32967 <br /> RE: Indian River County Jail Warehouse Addition <br /> Bid Documents: <br /> • A2.10 through A6.20 Donadio and Associates dated 5-17-2013 <br /> • S-1 through S-2 ML Engineering dated 5-17-2013 <br /> • M0.1 through M2.1 Kamm Consulting dated 5-17-2013 <br /> • E0.1 through E3.1 Kamm Consulting dated 5-17-2013 <br /> • FS0.1 through FS2.1 Kamm Consulting dated 5-17-2013 <br /> • Project Manual Donadio and Associates dated 5-17-2013 <br /> We hereby propose to construct the building portion of this project per the plans and specifications listed <br /> above for a total of$129,055.00(one hundred twenty nine thousand and fifty five dollars) <br /> With the following clarifications: <br /> GENERAL CONDITIONS <br /> 1. Permit fees are included <br /> 2. Impact fees are excluded <br /> (W 3. Layout and formboard survey are included <br /> 4. Soil compaction testing and concrete testing are included <br /> 5. Progress and final cleanup are included <br /> SITEWORK <br /> 1. All site improvements have been excluded from this proposal,including: <br /> a. Stripping,grading,compaction <br /> b. Final grade, landscaping,sod,irrigation <br /> c. Aprons or paving <br /> d. Fencing <br /> CONCRETE <br /> 1. Installed per plans and specifications—no changes to foundations are proposed <br /> STEEL AND MISC METALS <br /> 1. Interior column included with standard primer <br /> THERMAL AND MOISTURE PROTECTION <br /> 1. Wall and roof insulation per plan and wall section—VRV facing <br /> DOORS AND WINDOWS <br /> 1. Roll Up doors to match existing <br /> 2. New doors to be re-keyed per owner's directive <br /> (W <br /> Milton Construction and Consulting,LLC 1933o Sea Grape Drive Vero Beach,FL 32963 <br /> (772)485-8607 Fax(772)202-7050 <br /> FL CBC1250138 <br /> www.m iltonconstruction.com <br /> building construction facilities consulting project management <br /> 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.