My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/18/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
06/18/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:08:50 PM
Creation date
3/23/2016 8:58:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/18/2013
Meeting Body
Board of County Commissioners
Book and Page
347
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004NE.tif
SmeadsoftID
14219
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12th Street and 27th Avenue Improvements Page 2 <br /> Project No. PSL-09-3054 (10.7) <br /> April 12,2013 <br /> (W Field Observation & Testing <br /> • Earthwork observations by an engineering technician during the site grading operation <br /> including the proof-rolling of "strip grade" for the roadway widening alignment and <br /> embankment Construction as requested by Indian River County. <br /> • In-place density testing will be performed during placement of the embankment fill for <br /> roadway widening. The density tests will be performed at a frequency of approximately one <br /> (1) test for every 200 lineal feet of roadway/embankment within the proposed alignment, for <br /> each 1-foot thickness of backfill placed. <br /> • In-place density testing during backfilling of storm drains and catch basins for each 1-foot lift <br /> of backfill placed from the bottom of the structure up to an elevation corresponding to final <br /> grade. <br /> • In-place density testing during backfilling of the rigid and flexible pipelines. Below pavement <br /> areas, density tests will.be performed at a frequency of approximately one test location for each <br /> 2001f(or fraction thereof) of pipe. At each roadway or driveway crossing, density tests will be <br /> performed for each 6-inch lift of backfill placed starting at an elevation corresponding to the <br /> invert of the pipe and extending up to the final grade. <br /> • In-place density tests within the stabilized subgrade and base course layers at a frequency of <br /> approximately one (1) test for each 200 if of roadway. At roadway crossings for the pavement <br /> restoration, 24-inches of base rock will be placed and tested in four(4)6-inch lifts. <br /> • In-place density tests for the sidewalk and driveway subgrade prior to concrete placement. <br /> • Sampling, slump testing, molding, transporting, curing, and laboratory testing to determine the <br /> compressive strength of concrete used for the sidewalk, driveways and curbing. <br /> Laboratory Testing <br /> • Perform laboratory moisture-density relationship (Proctor) tests (AASHTO T-180 and <br /> AASHTO T-99) and sieve analysis (percent fines for soil classification purposes) tests on the <br /> embankment fill and/or pipe backfill soils. <br /> • Limerock Bearing Ratio (LBR) tests for stabilized subgrade and base course within the <br /> roadways. <br /> • Concrete cylinder test specimens will be tested following ASTM C39 for their compressive <br /> strength at 7 days and 28 days after placement. <br /> Eg ineerinz&Reporting <br /> • Engineering oversight during the construction to coordinate the aforementioned test program, <br /> make site visits, attend progress meetings, and provide professional engineering consultation, <br /> as needed. <br /> • Submittal of brief engineering reports documenting our findings and test results. <br /> (W <br /> DUNKMERGER <br /> 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.