My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/18/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
06/18/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:08:50 PM
Creation date
3/23/2016 8:58:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/18/2013
Meeting Body
Board of County Commissioners
Book and Page
347
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004NE.tif
SmeadsoftID
14219
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(W Water Main Plans ARCADIS ................ ............$0.00 , <br /> ( )...................... ... $86145.00 <br /> (Lump Sum) <br /> Corridor Study(ARCADIS).....;.............*..................:....:.....:::.......$0.00 $15,581.00 <br /> Cultural Resource Assessment........:........:.........::.:....,....,,:,;,.......$0.00 $8,925.93 <br /> TOTAL PROFESSIONAL SERVICES........................y...,...,......... $0.00 $2,019,698.09 <br /> HO URL Y RA TE ALLO WANCES <br /> Allowance for Sketch and Legal <br /> Descriptions and staking of parcels(3 75.001each)................NTE$0.00 $51,000.00 <br /> Allowance for miscellaneous roadway design <br /> changes due to right of way negotiations...............................NTE$0.00 $20,-000,00 <br /> Allowance for Survey Crew and Soft Dig <br /> Machine for Horizontal and Vertical <br /> Utility Locations at Potential Conflicts <br /> (Survey$1121Hr)......................................................................NTE$0.00 $20,000.00 <br /> (W Allowance for Survey and Design <br /> Of a transition to match the existing pavement <br /> At the north end of the project...............................................:.NTE$0.00 $27,000.00 <br /> Construction Engineering Services-Public Works ....NTE$20,000.00 $77,877.12 <br /> Construction Engineering Services-Utility Dept......... NTE$10,446.24 $10,446.24 <br /> TOTAL HO URL Y RA TE ALLO WANCES...................NTE$30,446.24 $206,323.36 <br /> Compensation for the hourly rate allowances will be made on an hourly basis at the <br /> hourly rates listed below: <br /> Project Engineer Manager..............................................$146.64 <br /> Project Engineer...............................................................$109.70 <br /> Senior CADD Operator....................................:...:...........»$85.84 <br /> CaddDraftsman......................».......................................... $56.89 <br /> Survey Project Manigger..:....................0...........................$106.40 <br /> Professional Surpoor..... ...................:...:...::...:.:::..::....... $98.30 <br /> Survey CADD Tech................................:............................ $68.17 <br /> 3 Man Field Crew. .......,. ...................................$126.84 <br /> 2 Man Field Crew.....::.:..........:.........:..............:....:.......... $114.14 <br /> Le Sr. Field Coordinator......................................................... $75.00 <br /> Page 3 of 4 <br /> G:\LNR Support\ADMIN\Marketing\Proposals\WPB\2013\66 th Ave Amendment No 13 5-30-13 .doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.