My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/18/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
06/18/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:08:50 PM
Creation date
3/23/2016 8:58:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/18/2013
Meeting Body
Board of County Commissioners
Book and Page
347
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004NE.tif
SmeadsoftID
14219
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
preparation of the final certifications, addressing contractor's request for information, and other <br /> miscellaneous duties. <br /> "SECTION IV—TIME FOR COMPLETION" is being modified to incorporate the <br /> following: <br /> The time for completion of Amendment Number 13 shall run concurrently with the construction <br /> of this project. <br /> "SECTION V—COMPENSATION"is being modified to incorporate the following: <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br /> pursuant to this Agreement fees in accordance with the following: <br /> A. Professional Services Fee <br /> 1. The basic compensation mutually agreed upon by the ENGINEER and the <br /> COUNTY follows: <br /> The following is a summary of costs. <br /> Charge Associated with <br /> Change in Project Scope New Total <br /> And Pro&ct Limits Compensation <br /> Geotechnical Services(71:erra)(Lump Sum) «.............................:.$0.00 $139,460.00 <br /> Engineering(ARCADIS) (Lump Sum)i.........................................$0.00 $953,975.50 <br /> Signal Plans(ARCADIS)................................................................$0.00 $84,726.66 <br /> Design Survey(66`h Avenue) (ARCADIS)....................................... $0.00 $169,500.00 <br /> Design Survey(Sidestreets)(ARCADIS)......................................... $0.00 $71,428.00 <br /> Right-of-Way Survey and Map(66*Avenue).................................$0.00 $117,$21.00 <br /> Right-of-way Survey(Sidestreets)....................................................$0.00 $61,963.00 <br /> Structural Design for 4 bridges <br /> (Bridge Design Associates,Inc.)...................................................... $0.00 $207,222.00 <br /> Landscape&Irrigation.................................................................... $0.00 $77,160.00 <br /> (Thomas Lucido&Associates) (Lump Sum) <br /> Pond Surveys..............a......awYNfe.1....... ........................i.ui'............ $0.00 $25,79000 <br /> Page 2 of 4 <br /> G:\LNR Support\ADMIT'I\Marketing\Proposals\wPB\2013\66 th Ave Amendment No 13 5-30-13 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.