Laserfiche WebLink
Professional Fee Allocation <br /> Sheriffs Office Crime Scene Unit <br /> Vehicle Compound Project <br /> Indian River County,Florida <br /> Revised May 24,2013 <br /> Page 2 <br /> 4. Phase III: Additional Services: UNDER CONTRACT <br /> Additional Services, consisting of a variety of tasks, are itemized and described in <br /> Attachment "C" of this Agreement. The following is a summary of these services and <br /> their related professional fee allocation. <br /> TOTAL <br /> TASK FEE <br /> 4.1 Interior Design Services: <br /> (1.1.1 Attachment"C") <br /> $ TBD @ 14.0%.................................................................................$ TBD <br /> 4.2 Off-Site Civil Engineering $ TBD <br /> 4.3 Landscape Architectural Services......................................................$ 9,800.00 <br /> 4.4 Site and Building Identifications (Not to Exceed).............................$ 4,200.00 <br /> 4.5 Professional Liability Insurance ........................................................$ N/A <br /> 4.6 Permitting Coordination Services......................................................$ 6,500.00 <br /> 4.7 Sales Tax Exemption Program...........................................................$ By GC/IRC <br /> 4.8 Facility Energy Analysis....................................................................$ N/A <br /> 4.9 Facility Rendering N/A <br /> • Reimbursable Expenses..............................................................$ N/A <br /> `0- 4.10 Special Engineering $ TBD <br /> ........................................................................... <br /> 4.11 Extended Construction Observation..................................................$ TBD <br /> 4.12 Post Occupancy/Warranty Inspection................................................$ TBD <br /> 4.13 Cost Estimating: <br /> 4.13.1 Schematic Design Phase.....................................................$ N/A <br /> 4.13.2 Design Development Phase ................................................$ 2,400.00 <br /> 4.13.3 75% Construction Documents Phase..................................$ 3,200.00 <br /> 4.13.4 95% Construction Documents Phase..................................$ TBD <br /> 4.14 Computer Cable System Design (Not to Exceed)..............................$ 11,200.00 <br /> 4.15 Security Consultant(Not to Exceed) .................................................$ 12,800.00 <br /> 4.16 Site Surveying By County <br /> 4.17 Geotechnical Engineering..................................................................$ <br /> 4.18 Grants Application Assistance...........................................................$ TBD <br /> 4.19 Additional Construction Observation Services..................................$ TBD/See Below <br /> 4.20 Record/Conformance Drawings.........................................................$ TBD <br /> 4.21 Voter Referendum Assistance (if requested).....................................$ N/A <br /> 4.22 "Basic" Level LEED Design& Certification....................................$ N/A <br /> 4.23 Traffic Impact Study (T.I.S.) .............................................................$ TBD <br /> 4.25 Communications Consultant..............................................................$ N/A <br /> 4.26 Audio-Visual Consultant...................................................................$ N/A <br /> 4.24 Subtotal .............................................................................................$ 50,100.00 <br /> 89 <br />