Laserfiche WebLink
Professional Fee Allocation <br /> Sheriffs Office Crime Scene Unit <br /> Vehicle Compound Project <br /> Indian River County,Florida <br /> Revised May 24,2013 <br /> �..- Page 3 <br /> 4A. Phase III-A: Additional Services Work Order#3: <br /> Additional Services for Vehicle Compound Project, consisting of a variety of tasks, <br /> are itemized and described in Attachment "C" of Original Agreement Work Order. <br /> The following is a summary of these services and their related professional fee <br /> allocation. <br /> TOTAL <br /> TASK FEE <br /> 4.1A Interior Design Services: <br /> (1.1.1 Attachment"C") <br /> $ TBD @ 14.0%.................................................................................$ N/A <br /> 4.2A Off-Site Civil Engineering.................................................................$ TBD <br /> 4.3A Landscape Architectural Services..................................................$ 5,335.00 <br /> 4.4A Site and Building Identifications (Not to Exceed).............................$ N/A <br /> 4.5A Professional Liability Insurance ........................................................$ N/A <br /> 4.6A Permitting Coordination Services..................................................$ 3,500.00 <br /> 4.7A Sales Tax Exemption Program...........................................................$ By GC/IRC <br /> 4.8A Facility Energy Analysis....................................................................$ N/A <br /> 4.9A Facility Rendering..............................................................................$ N/A <br /> • Reimbursable Expenses..............................................................$ N/A <br /> ,., 4.10A Special Engineering/Fire Protection..............................................$ 2,500.00 <br /> 4.10B Special Engineering/CSI Administrative Approval......................$ 3,850.00 <br /> 4.11A Extended Construction Observation..................................................$ TBD <br /> 4.12A Post Occupancy/Warranty Inspection................................................$ TBD <br /> 4.13A Cost Estimating: <br /> 4.13.1A Schematic Design Phase.....................................................$ N/A <br /> 4.13.2A Design Development Phase................................................$ N/A <br /> 4.13.3A 75% Construction Documents Phase..................................$ N/A <br /> 4.13.4A 95% Construction Documents Phase..................................$ N/A <br /> 4.14A Computer Cable System Design(Not to Exceed)..............................$ N/A <br /> 4.15A Security Consultant ........................................................................$ 2,500.00 <br /> 4.16A Site Surveying....................................................................................$ By County <br /> 4.17A Geotechnical Engineering..................................................................$ By County <br /> 4.18A Grants Application Assistance...........................................................$ N/A <br /> 4.19A Additional Construction Observation Services.................. $ TBD/See Below <br /> ................ <br /> 4.20A Record/Conformance Drawings.........................................................$ TBD <br /> 4.21A Voter Referendum Assistance (if requested).....................................$ N/A <br /> 4.22A "Basic" Level LEED Design& Certification....................................$ N/A <br /> 4.23A Traffic Impact Study (T.I.S.) .............................................................$ TBD <br /> 4.25A Communications Consultant..............................................................$ N/A <br /> 4.26A Audio-Visual Consultant...................................................................$ N/A <br /> 4.24A Subtotal Phase III-A.........................................................................$ 17,685.00 <br /> 90 <br />