My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/16/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
07/16/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 2:59:54 PM
Creation date
3/23/2016 8:59:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet
Document Type
Minutes
Meeting Date
07/16/2013
Meeting Body
Board of County Commissioners
Book and Page
274
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NH.tif
SmeadsoftID
14222
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br />PC South — Approval of Contract for Construction <br />BCC Meeting — July 16, 2013 <br />July 8, 2013 <br />bid is presented as Attachment C and a sample construction contract with Close <br />Construction is presented as Attachment D. <br />The Engineer's Opinion of Probable Construction Cost for the PC South Algal Nutrient <br />Removal Facility and South Relief Canal pump station (not including County direct <br />purchase items) was $6,585,000. The PC South construction contract will be <br />administered by Public Works Stormwater Division. <br />B. Construction Contract for a Stormwater Force Main from the South Relief <br />Canal Pump Station to the PC South Site; and a Brine Concentrate Force <br />Main from the South County Water Treatment Plant to the PC South Site <br />A large diameter (±24 inch) force main must be constructed from PC South's pumping <br />station at the South Relief Canal near 27th Avenue, to the PC South Site. Also, a force <br />main carrying reverse osmosis brine concentrate must be constructed from the South <br />County Water Treatment Plant to the PC South site. The pipelines were designed by <br />Kimley-Horn and Associates and the design and bidding was managed by Division of <br />Utility Services. Requests for bids for the force main construction contract (titled "South <br />County Brine Disposal Pipeline") were advertised on May 2, 2013 (Bid No. 2013038). <br />Attachment E shows the proposed pipeline routes. <br />Seven construction bids were received on June 6, 2013 and are listed in Table 2. <br />Detailed bids are presented in Attachment F. <br />Table 2 — South County Brine Disposal Pipeline Bids <br />South County Brine Disposal <br />Pipeline Bidder <br />Total Base Bid <br />Price <br />Felix Associates of Florida, Inc. <br />$1,164,853.40 <br />TB Landmark Construction, Inc. <br />$1,328,896.00 <br />Andrew Sitework, LLC <br />$1,394,524.40 <br />Metro Equipment Service, Inc. <br />$1,526,978.00 <br />Timothy Rose Contracting, Inc. <br />$1,609,785.94 <br />Melvin Bush Construction, Inc. <br />$1,629,711.27 <br />SDV Services, LLC <br />$1,791,685.00 <br />With a low bid of $1,164,853.40, Felix Associates of Florida, Inc. (Felix) is the apparent <br />lowest responsive bidder. Kimley-Horn found no evidence suggesting Felix could not <br />perform the Work, and received positive references regarding past work performed by <br />Young's Communications, the proposed subcontractor for horizontal directional drilling <br />on this project. Kimley-Horn recommends the County Commission award the <br />construction contract to Felix. A complete copy of Felix Associates' bid is presented as <br />4 <br />F:\Public Works\KeithM\Stormwater Projects\PC South Construction\Agenda Items\Agenda - PC South Recommendation of Bid o <br />180 Q U <br />Award for Construction.doc I <br />
The URL can be used to link to this page
Your browser does not support the video tag.