My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/16/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
07/16/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 2:59:54 PM
Creation date
3/23/2016 8:59:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet
Document Type
Minutes
Meeting Date
07/16/2013
Meeting Body
Board of County Commissioners
Book and Page
274
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NH.tif
SmeadsoftID
14222
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />Page 5 <br />PC South — Approval of Contract for Construction <br />BCC Meeting — July 16, 2013 <br />July 8, 2013 <br />Attachment H and a sample construction contract with Felix Associates is presented as <br />Attachment I. <br />The Engineer's Opinion of Probable Construction Cost for the pipeline bid was <br />$1,640,000. The pipeline construction contract will be administered by Division of Utility <br />Services with assistance from Kimley-Horn and Associates. <br />C. Direct Purchase of Certain PC South Equipment <br />The PC South project includes several major pieces of equipment that the County may <br />directly purchase to avoid payment of sales tax. The costs are summarized in Table 3. <br />Table 3 — Direct Purchase Equipment Costs <br />Direct purchasing the above equipment will result in an estimated state sales tax <br />savings of $75,206.60. The manufacturers for the first three items were selected <br />because similar equipment from these manufacturers is installed at Egret Marsh <br />(Xylem/Flygt and Duperon) and PC Main Screening System (Duperon). The similar <br />equipment works properly and staff is intimately familiar with its operation. <br />Standardization of major equipment will increase the efficiency of staff operational, <br />maintenance, and repair efforts. <br />Another direct purchase item was also considered: a Duperon 2 mm diameter <br />perforated plate screen ($432,000) for the PC South headworks structure. The <br />perforated plate was intended to remove small particles pumped into the facility from the <br />South Relief Canal. However, staff does not believe the perforated plate's benefit <br />justifies its cost. Staff will delete the perforated plate from the project and redesign the <br />headworks structure, maximizing its ability to settle solids for periodic removal by <br />vacuum truck. <br />5 <br />F:\Public Works\KeithM\Stormwater Projects\PC South Construction\Agenda Items\Agenda - PC South Recommendation of Bid 181 <br />Award for Construction.doc <br />Direct <br />Corresponding <br />Item <br />Description <br />Vendor <br />Purchase <br />Attachment <br />Amount <br />1 <br />South Relief Canal pumps <br />Xylem/Flygt <br />$470,806.00 <br />Attachment J <br />and controls stem <br />2 <br />Pump Station No. 1 <br />Xlyem/Flygt <br />$212,574.00 <br />Attachment J <br />pumps and controls stem <br />Self-cleaning bar screen <br />Duperon <br />3 <br />for the South Relief Canal <br />Corporation <br />$191,000.00 <br />Attachment K <br />pump station <br />Self-cleaning harvest rake <br />To Be <br />$200,000 <br />N/A <br />4 <br />for PC South <br />Determined <br />estimated <br />TOTAL DIRECT PURCHASE PRICE <br />$1,074,380.00 <br />Direct purchasing the above equipment will result in an estimated state sales tax <br />savings of $75,206.60. The manufacturers for the first three items were selected <br />because similar equipment from these manufacturers is installed at Egret Marsh <br />(Xylem/Flygt and Duperon) and PC Main Screening System (Duperon). The similar <br />equipment works properly and staff is intimately familiar with its operation. <br />Standardization of major equipment will increase the efficiency of staff operational, <br />maintenance, and repair efforts. <br />Another direct purchase item was also considered: a Duperon 2 mm diameter <br />perforated plate screen ($432,000) for the PC South headworks structure. The <br />perforated plate was intended to remove small particles pumped into the facility from the <br />South Relief Canal. However, staff does not believe the perforated plate's benefit <br />justifies its cost. Staff will delete the perforated plate from the project and redesign the <br />headworks structure, maximizing its ability to settle solids for periodic removal by <br />vacuum truck. <br />5 <br />F:\Public Works\KeithM\Stormwater Projects\PC South Construction\Agenda Items\Agenda - PC South Recommendation of Bid 181 <br />Award for Construction.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.