My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/16/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
07/16/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 2:59:54 PM
Creation date
3/23/2016 8:59:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet
Document Type
Minutes
Meeting Date
07/16/2013
Meeting Body
Board of County Commissioners
Book and Page
274
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NH.tif
SmeadsoftID
14222
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 <br />PC South — Approval of Contract for Construction <br />BCC Meeting — July 16, 2013 <br />July 8, 2013 <br />Through Egret Marsh's operation, staff has concluded that its Duperon fine screen <br />FlexRake is not well-suited for harvesting algae. Staff is currently working with a local <br />conveyor/screening system manufacturer to design a simple prototype replacement for <br />the Egret Marsh harvest rake. It is our intent to install a similar harvest screen at PC <br />South. We have used a budget figure of $200,000 for this harvest screen in the above <br />table. <br />D. Construction Contingency Fee Reserve <br />It is often necessary to issue change orders to accommodate unforeseen conditions. <br />Therefore, staff recommends the Board authorize a contingency fee reserve equal to <br />approximately 5% of the Close Construction and Felix Associates bids, and authorize <br />staff to use the reserve for change orders as deemed necessary by staff, up to the <br />amount of the reserve. This will allow staff to make rapid construction decisions and <br />avoid untimely construction delays. The recommended contingency fee reserve amount <br />is $351,000.00. <br />E. Hydromentia, Inc. License Fee <br />Hydromentia, Inc. is apparent patent holder of algal turf scrubber (ATS) technology <br />associated with the algal nutrient removal facility. Hydromentia originally required the <br />County pay a $380,000 fee for the right to use the ATS technology at PC South (equal <br />to the technology fee it required for the Egret Marsh ATS). Staff protested this amount <br />in a May 30, 2013 letter to Hydromentia, included herein as Attachment L. Hydromentia <br />now agrees to reduce the license fee to $190,000 if the County agrees to certain <br />conditions listed in a June 19, 2013 response letter, included herein as Attachment M. <br />Hydromentia requires the County to agree to and sign the June 19 letter and return one <br />executed copy to its Ocala office. Hydromentia will then prepare a license agreement. <br />The license agreement will be presented as a future Commission Agenda Item once the <br />County Attorney Office and Hydromentia have successfully completed negotiations. <br />Absent litigation, PC South cannot be constructed without payment of the license fee <br />and approval of a license agreement. Hydromentia will restrict the use of the ATS <br />technology to the PC South site, meaning if the County desires to construct another <br />ATS system, it must pay Hydromentia another license fee and enter into another license <br />agreement. <br />F. Available Grant Funds for Construction <br />The County has two grant contracts for construction: <br />1. FDEP Section 319(h) Grant No. G0353 = $750,000.00 <br />2. FDEP Grant Agreement No. LP31010 =$156,000.00 <br />Total Grant Construction Funding = $906,000.00 <br />6 <br />F:\Public Works\KeithM\Stormwater Projects\PC South Construction\Agenda Items\Agenda - PC South Recommendation of Bid n <br />Award for Construction.doc L <br />
The URL can be used to link to this page
Your browser does not support the video tag.