My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/16/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
07/16/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 2:59:54 PM
Creation date
3/23/2016 8:59:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet
Document Type
Minutes
Meeting Date
07/16/2013
Meeting Body
Board of County Commissioners
Book and Page
274
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NH.tif
SmeadsoftID
14222
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />Page 7 <br />PC South — Approval of Contract for Construction <br />BCC Meeting — July 16, 2013 <br />July 8, 2013 <br />G. Construction Costs Associated With This Agenda Item <br />A summary of the construction costs associated with this Agenda Item are presented in <br />Table 4. <br />Table 4 — Construction Costs Associated With This Agenda Item <br />Item <br />Description <br />Amount <br />1 <br />Close Construction bid for the PC South Treatment Facility and <br />South Relief Canal Pump Station <br />$5,856,660.20 <br />2 <br />Felix Associates bid for the stormwater and brine concentrate <br />force mains <br />$1,164,853.40 <br />3 <br />1 Direct Purchase Items <br />$1,074,380.00 <br />_ <br />:::A:=Construction <br />Contingency Fee Reserve <br />$ 351,000.00 <br />5 <br />1 H dromentia, Inc. License Fee <br />$ 190,000.00 <br />Total Costs Before Considering Grant Funds <br />$8,636,893.60 <br />6 Deduct for Construction Related Grant Funding <br />($ 906, 000.00 <br />TOTAL COSTS ASSOCIATED WITH THIS AGENDA ITEM AFTER <br />GRANT FUNDS ARE CONSIDERED <br />$7,730,893.60 <br />To reduce the PC South treatment facility construction cost, staff revisited the design <br />and identified some items that may be eliminated without significant detriment to the <br />overall project. Major revision items include redesign of the headworks structure due to <br />elimination of the perforated plate screen, deletion of an aeration system, and deletion <br />of a biogas removal system. Staff estimates these revisions and deductions will equal <br />approximately $275,985. <br />Note that landscaping is not included in Table 4 due to permitting delays encountered <br />while interfacing with the U.S. Fish and Wildlife Service (FWS) regarding the Florida <br />scrub jay. FWS determined the Florida scrub jay may utilize the site for feeding or other <br />purposes and therefore, FWS requires the site be landscaped with scrub jay friendly <br />plants. Staff is preparing this design with the assistance of the County's environmental <br />consultant, G.K. Environmental, Inc. under an existing Work Order. Staff estimates the <br />landscaping and required five-year maintenance and exotic plant control costs to be <br />approximately $160,000. The landscaping work will be performed in a separate <br />contract in coordination with the selected site contractor. Estimated landscaping costs <br />are included in Table 5, below. <br />Construction testing (e.g. density testing, concrete testing, etc.) will be performed by a <br />geotechnical testing firm selected and paid for by the County independently of the <br />construction contracts. The estimated fee for construction testing is $100,000 and it is <br />not included in Table 4 but it is included in Table 5, below. <br />7 <br />F:\Public Works\KeithM\Stormwater Projects\PC South Construction\Agenda Items\Agenda - PC South Recommendation of Bid <br />Award for Construction.doc 183 <br />
The URL can be used to link to this page
Your browser does not support the video tag.