My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/16/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
07/16/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:15:07 PM
Creation date
3/23/2016 8:59:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet
Document Type
Minutes
Meeting Date
07/16/2013
Meeting Body
Board of County Commissioners
Book and Page
274
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NH.tif
SmeadsoftID
14222
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 <br /> PC South—Approval of Contract for Construction <br /> BCC Meeting —July 16, 2013 <br /> (W July 8, 2013 <br /> H. Total Costs Associated With PC South <br /> Table 5 presents a summary of costs that have either already been paid or are <br /> obligated costs associated with construction of the PC South project, including the costs <br /> presented in Table 4. The table was prepared with the assistance of Division of Utility <br /> Services. The total remaining construction related costs for the project are estimated to <br /> be over $8.5 million. Total project costs (not including yearly operation and <br /> maintenance costs) will be just over$10 million. <br /> Table 5— Costs for PC South: Costs To-Date and Projected Costs <br /> Item Description/Vendor Amount Amount To <br /> Already Paid Be Paid <br /> 1 Carter Associates — land surveying $3,375.00 -- <br /> 2 Dean Meed — mitigation credits $8,000.00 -- <br /> 3 FDEP — Environmental Resource Permit fees $2,050.00 -- <br /> 4 Clerk of Court— recording fee $18.50 -- <br /> 5 GFA International — geotechnical investigations $60,719.00 -- <br /> 6 GFA International — construction testing -- $100,000 <br /> 7 GK Environmental— environmental services $13,755.00 <br /> 8 GK Environmental — landscaping design -- $5,940.00 <br /> 9 PC South Landscaping and exotic control -- $160,000.00 <br /> 10 Hydromentia— RO discharge permitting and $309,988.00 $79,497.00 <br /> design <br /> 11 Indian River Count — permit fees $2,796.72 -- <br /> 12 Indian River Farms Water Control District— $1,600.00 <br /> pe mit fees <br /> 13 1 Kimle -Horn — design $288,514.00 $57,486.00 <br /> 14 Land purchase $755,577.70 -- <br /> 15 Masteller, Moler, Reed — land surveying $16,565.00 -- <br /> 16 Melvin Bush & Suppliers— 24" stormwater main $24,760.14 -- <br /> 17 Reprographic Solutions — copies $77.40 $100.00 <br /> 18 Scripts Treasure Coast Newspaper— bid notice $136.59 -- <br /> 19 Southeast Structural Engineers — misc. $2,000.00 $5,000.00 <br /> structure <br /> 20 St. Johns River Water Management District— $1,000.00 -- <br /> Consumptive Use Permit <br /> 21 Proposed WalkingTrail -- $225,000.00 <br /> Close Construction bid for the PC South <br /> 22 Treatment Facility and South Relief Canal -- $5,856,660.20 <br /> Pump Station <br /> 8 <br /> F:\Public Works\KeithM\Stormwater Projects\PC South Construction\Agenda ItemsWgenda-PC South Recommendation of Bid 18 4 <br /> Award for Construction.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.