43 SY 528.00
<br /> $1,204. $62.00 $2,666:00 550.00 52,350.00 530.00 �$60000'020
<br /> 51,075.00
<br /> 3.35 Concrete sidewe6ut et Headworks SWcture 1 LS 514,980.00 $14,960.00 530 000.00 $30,000.00 $17,600.00 537,500.0 $ , .00 $15,000.00
<br /> 3.36Fumbh and imtall Pob Bem 1 LS $39,702.00 539,702.00555,000.00 55$,000.00 $45,000.00 $a, . .00337,000.00 $37.000.00
<br /> 3.37 -Fumbh and irotall Control Buikli end accessories 1 LS 518,230.00 _ 518,23oAo 530.000.00 530,000.00 $19,000.00 $19.009•ao $22 000.00
<br /> 522,000.00 519000.00 S$9 x•00
<br /> 3.36. 9rlle a Oontfl9W Weil - 1 LS $29.231.00 $29,231.00 $90,000.00 590,000.00 57,500.00 $7,500.00 .571 000.00 571,000.00
<br /> 59.500.00 $9,500.00
<br /> 3.39 Hewes aaese tam and westdistrmutwn channel cieanin flume 1 LS 512 072.00 512,072.00 $80,000.00 580.000.00 f4 500.00 $4,500.00 52,200.00 52,200.00
<br /> S2 000.00 $2,000.00
<br /> 3.40 Eerviss button channel clean in flume 1 LS $418,568.00 $418,566.00 5350.000.00 5350,000.00 4375,000.00 5375,000.00 5625,000.00 $625,000.00
<br /> $350,000.00 5350,000.00
<br /> 3:41 Heatlworit Structure.IncludingInfluent distribution channel 1 LS 5261,007.00 $261,007.00 5475,000.00 $475,000.00 5350,000.00 $31 000.00 5575
<br />000.00 5575,000.00 3395,000.00 5395,000.00
<br /> 3.42 Effluent Structure 1 LS. $5,785.00 $5,785.00 59,000.00 $9,000.00 56000.00 56.000.00 58.200.00 $8,200.00 516,000.00 516,000.00
<br /> 3.43 Du ronPerfo sled Plate Screen at Influent Structure 1 LS 1195000 53,250.00 58,000.00 $9,000.00 53,500.00 53,500.00 38,500.00 $8,500.00
<br /> $30,000.00 530,000.00
<br /> 3.44 D reOHanreat Rake at Effluent Structure 1 LS $18,995.00 $18,495.00 565,000.00 $65,000.00 520 000.00 $20,000.00 526,000.00
<br /> 5x6,000.00 543,000.00 $43,000.00
<br /> 3;45: SubmarBWb Mfxer'a tem:at.EflluentSWcwm 1 'LS $59,508.00 $59,508.00 550,000.00 $50,000.00 555.000.00 555.000.00 578.000.00 578,000.00
<br /> 569,000.00 $69,000.00
<br /> 3,46 Aeration tem of Effluent Structure 1 LS 511,879.00 $71,879.00 531,000.00 531,000.00 512,000.00 512,000.00 516,000.00 $26,000.00
<br /> 514,000.00 $14,000.00
<br /> 3:47. Su r device at Influent Structure 1 599 994,00 $68,984.00 5725,000.00 5125,000.00 $40,000.00 540,000.00 5732,000.00 $13z,000.00
<br /> 570,000.00 570,000.00
<br /> 3.48 -12-thick stabilized subarade for concrete floway 246 Sy., $38.00 S8a5,348.00 542.00 $93a,332A0 $35.00 5778,610.00 532.00 5731,872.00
<br /> 530.00 $667,380.00
<br /> 3.49 8'thickcenorete Howe 1 LS.. $17,120.00 517,120.00 5510,000.00 $510,000.00 $50,000.00 550,000.00 534.000.00 531,000.00 330,000.00
<br /> 530,000.00
<br /> .4 Centck concrete
<br /> Flume 1 lS' $20,272.00 520,x72.00 $90,000.00 $90,000.00 532,000.00 532,000.00 557,000.00 $51,000.00 536,000.00 536,000.00
<br /> 3.5 Effluent Flumes 1 LS` 5155,754.00 $155,754.00 5120,000.00 $120,000.00 5120,000.00 $120,006.00 #10,000.00 $230,000.00 590.000.00
<br /> $90,000.00
<br /> 3.52 B es vend 9-tem 1 - -LS 5207,974.00 5207,974.00 5255 000.00 $x55,000.00 5100,000.00 5100,000.00 5207,000.00 5207,000.00 5160,000.00 5160,000.00
<br /> 3.63 Pum`Station No.f 1 LS: 573,398.00 573,396JI0 585,000.00 585,000.00 5115,000.00 5115,000.00 5108,000.00 5108,000.00 575,000.00
<br /> $75,000.00
<br /> 3:54 72:Re pyV Force Main '. ... 1 LS- 530,165.00 $30,165.00 $45,000.00 545,000.00 535,000.00 535,000.00 568,000.00 566,000.00
<br /> 540,000.00 5a0,o0o.00
<br /> 3.55 12'.R forall oncewash hose stadona and otherwash-sta8ons 7 LS' 518,960.00 $18,969.00 525,000.00 525,000.00 555,000.00 555,000.00 $42,000.00
<br /> 54x,000.00 521,000.00 521.000.00
<br /> 3.56.. 8'Re cle Force Main 1 LS $37,619.00 537,619.00 325,000.00 $25,000.00 312,500.00 512,500.00 529,000.00 529,000.00 520,000.00
<br /> $20,900.90
<br /> 3:57 New Backu Re b Pum tem 1 LS 5250.00 5250.00 515,000.00 $15,000.00 $16 000.00 518,009.00 51,300.00 $1,399.00 $5,000.00 $5,�•�
<br /> 3:58. Flow testaxisti wells for Backup R Ie Pum System- $312,380.00 5312,380.00 $355,000.00 $355,000.00 5400,000.00 Sa00,000.00 5400,000.00
<br />$$65,000.00 5294.000.00 $z9a,00o.00
<br /> 3:59 24 Influent Force Main - 1 LS 543.553.00 $43,553.00 550,000.00 $50,000.00 $65,000.00 5$6,000.00 $65.000.00 5$5,000.00
<br /> $52,000.00 552,000.00
<br /> 3.6 12 RO Concentrate Force Main - 1 LS 59 312.011 $9,312.00 510,000.00 $10,000.00 16,000.00 56,000.00 35,500.00 $5,500.00 58,000.00
<br /> 58,000.00
<br /> from Structure S5 to PumpStation No.1 1 LS 5210,000.00 5210,000JK1 $180,000.00 $180,000.00 1250,000.00 $250,000.00 $205,$14.00 $$33,600.00 5425,000.00 $125,9
<br />00.00
<br /> 3.62- Site Electric 400 -LF $13.11 $31,464.00 575.00 $36,000.00 514.00 $33,600.00 5$2.00 5$2,600.00 5$2.00 $33,600.00
<br /> 3.63: -.T 6 Coated Chain4Jnk Fence 1.115 LF 52.00 $2,230.00 52.00 $2,230.00 52.00 $2,230.00 52.00 52,230.00 52.00 52,230.00
<br /> 3.64._:: 3-Strand barb wire on existin Water Treatment Plant fence 1 EA 52 360 00 $2,360.00 53,000.00 $3,000.00 52,500.00
<br /> $2,500.00 $2,600.00 $2,600.00 $2,400.00 $2,490.00
<br /> 3.65 `.-32'wide coaled chain-link fence double ates 1 EA 52,115.00 52,115.00 53,000.00 $3,90000 SZ 300.00 52,300.00 $2,300.00 $2,300.00
<br /> -$2,2011.00 52,200.00
<br /> -7-6 .00
<br /> ceated chain-link fence double ales 1 FA 51.350.00 $1,350.00 $2,000.00 $2,000.00 51,500.00 $1.500.00 $1,500.00 Z,3,5-01) $7.400.00 $1,400.00
<br /> 17 wide coated chain-link fence sin le ates 1 .EA 13,050.00 $3,050.00 33,500.00 $3,500.00 $3,250.00 $3,250.00 $3,400.00 �$3,400.00
<br /> $3,000.00 53•x•00
<br /> 3.68 18'wide coated chain-link fence cantilevered gates 1 EA $3,350.00 $3,350.00 $4,000.00 $4,000.00 $3,500.00 $3,500Jk1 $3.700.00 53,700.00
<br /> 33.300.00 53,300.00
<br /> 3.69 I V wide coated chain-link fence cantilevered ales 55,000.00 $•30O'00 53,300.00 57,500.00 51,500.00
<br /> 3.7 Abandon RO Concentrate piping at South County RO Water Treatment Plant per Sheat OFi 1 LS $2.535'00
<br /> $2,535.00 $3,000.00 $3,000.00 $5,000.00
<br /> 4,000.
<br /> 3,71 Ripta 1 LS $25,240.00 $25,240.00 $65,000.00 56$,000.00 54,000.00 Sa,o9o.00 52,80
<br /> In Subblerel J-1 Canal r Sheat OF2 0.00 $2.800.00 $4,000.00
<br /> $90,000.00 590,000.00 $99,000.09 580,000.00 580.000.00
<br /> LS $107,590.00 $60,000.00 $60.000.00 $90,000.00
<br /> 3.72 Improvements at intersection of Sublateral J-1 Canal and Lateral J Canal per Sheet 0F3 1 $107,590.00
<br /> 5,000.
<br /> 3.73 ConsWd oftsRe stabilized .00
<br /> driveway connection per Sheet OF4 1 LS $4,618.00 $4,638.00 55.000.00 $5,000.00 16,500.00 $6,590.00 $2,800.00 $2,800.00 $5,000.00
<br /> 3.74 Fifteen consecutive de interim o len clod 1 LS 557,500.00 $57,500.00 5410,000.00 5410,000.00 $20,000.0 $129,000.00 556,000.00
<br /> $$6.000.00 5535,000.00 55 5,000.09
<br /> 3.75 Other items $485466010 57,86617200
<br /> $6,939,010.00 $4784,000.00 $6,397,009.00
<br /> 707A1S Gibbs&Register,Inc Wharton-Smith,Inc. Lucas Marine AcqulslUon Co.I.I.C. Cardinal Contractors,nc
<br /> CIOX Construction,LLC
<br /> $30.00 $60.50 73 $73.00
<br /> UNIT PRICES FOR ADDITIONAL SERVICE WORK 1 Ll, 14 $14.00 50 $59.00
<br /> 30
<br /> A. Excevetion and Disposal of Unsuitable Materiel.
<br /> Imported Type 2 Fiil'Baclt66 Material to-P--excevaled Unsuitable Material.1"1900 and 511.75 60 $60.00
<br /> B. Compacted,Including related incidentals 1 Cy 22 522.00 10 $10.00 100 $100.00
<br /> Imported Type 3 FilllBackf6l Material to replace excavated Unsuitable Material,"lace and $11.75 61 $6i.0o
<br /> C. compacted,including related incidentals 1 Cy
<br /> za $z4.00 u 515.00 16 $16.00
<br /> I"1
<br />
|