Laserfiche WebLink
ATTACHMENT D <br />SECTION 00520 - AGREEMENT - ADDENDUM NO. 2 <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: Construction of an algal <br />nutrient removal facility, stormwater pumping stations, force mains, and associated <br />peripheral systems. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: PC SOUTH ALGAL NUTRIENT REMOVAL FACILITY <br />(W County Project Number: 0949 Bid Number: 2013030 <br />Project Address: 1225 5th Street SE, Vero Beach, FL 32962. <br />ARTICLE 3 — ENGINEER <br />3.01 The Stormwater Division of the Indian River County Public Works Department is <br />hereinafter called the ENGINEER and will act as OWNER's representative, assume all <br />duties and responsibilities, and have the rights and authority assigned to ENGINEER in <br />the Contract Documents in connection with the completion of the Work in accordance with <br />the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Final Completion, and completion and readiness for <br />final payment as stated in the Contract Documents are of the essence to the Contract. <br />4.02 Days to Achieve Final Completion and Final Payment <br />A. The Work will be fully completed (Final Completion) and ready for final payment in <br />accordance with paragraph 14.07 of the General Conditions on or before the 365th 27& <br />day from the date the Contract Time commences as set forth in the Notice -to -Proceed <br />(Section 05550). <br />4.03 Liquidated Damages <br />Attachment D - 00520 - Agreement - Addendum No. 2 <br />ADDENDUM NO. 2 00520 - 1 /� <br />F:\Public WorksWeithM\Stormwater Projects\PC South Construction\Agenda IternMAttachment D - 00520 - Agreement - Addendum No. 2.doc Rev. 05/07 L <br />