Laserfiche WebLink
ATTACHMENT D <br /> SECTION 00520 - AGREEMENT - ADDENDUM NO. 2 <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br /> OWNER) <br /> and <br /> (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br /> agree as follows: <br /> ARTICLE 1 -WORK <br /> 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents. The Work is generally described as follows: Construction of an algal <br /> nutrient removal facility, stormwater pumping stations, force mains, and associated <br /> peripheral systems. <br /> ARTICLE 2 -THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows: <br /> Project Name: PC SOUTH ALGAL NUTRIENT REMOVAL FACILITY <br /> (W County Project Number: 0949 Bid Number: 2013030 <br /> Project Address: 1225 5th Street SE, Vero Beach, FL 32962. <br /> ARTICLE 3— ENGINEER <br /> 3.01 The Stormwater Division of the Indian River County Public Works Department is <br /> hereinafter called the ENGINEER and will act as OWNER's representative, assume all <br /> duties and responsibilities, and have the rights and authority assigned to ENGINEER in <br /> the Contract Documents in connection with the completion of the Work in accordance with <br /> the Contract Documents. <br /> ARTICLE 4 -CONTRACT TIMES <br /> 4.01 Time of the Essence <br /> A. All time limits for Milestones, if any, Final Completion, and completion and readiness for <br /> final payment as stated in the Contract Documents are of the essence to the Contract. <br /> 4.02 Days to Achieve Final Completion and Final Payment <br /> A. The Work will be fully completed (Final Completion) and ready for final payment in <br /> accordance with paragraph 14.07 of the General Conditions on or before the 365th 27& <br /> day from the date the Contract Time commences as set forth in the Notice-to-Proceed <br /> (Section 05550). <br /> 4.03 Liquidated Damages <br /> Attachment D-00520-Agreement-Addendum No.2 <br /> ADDENDUM NO.2 00520-1 /� <br /> F:\Public WorksWeithM\Stormwater Projects\PC South Construction\Agenda ItemsW.ttachment D-00520-Agreement-Addendum No.2.doc Rev.05/07 L <br />